The first civil tender for the construction of elevated stretch of Corridor 2 of Agra Metro Rail Project has been floated by Uttar Pradesh Metro Rail Corporation Limited.
The scope of work includes design and construction of elevated via duct and 07 Nos. elevated stations including civil, architectural finishes, water supply, sanitary supply, sanitary installation, drainage, external development, fire fighting, fire detection, E&M works and PEB structures of Corridor 2 of Agra Metro at Agra, Uttar Pradesh, India.
Systra MVA, a French company has been appointed as DDC for providing design consultancy services for the Corridor 2 of Agra Metro.
The corridor 2 will be 15.4 kms long and the trains will be feeded from the proposed Metro Depot at Kalindi Vihar.