{"id":9907,"date":"2022-07-20T04:51:06","date_gmt":"2022-07-20T04:51:06","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=9907"},"modified":"2023-06-17T04:26:49","modified_gmt":"2023-06-17T04:26:49","slug":"ntpc-set-to-award-first-coal-fired-plant-in-about-six-years","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/ntpc-set-to-award-first-coal-fired-plant-in-about-six-years\/","title":{"rendered":"NTPC set to award first coal-fired plant in about six years"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/9907?pdf=9907\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\" wp-image-9908 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/07\/NTPC-set-to-award-first-coal-fired-plant-in-about-six-years.jpg\" alt=\"\" width=\"413\" height=\"275\" \/><\/p>\n<p>The largest power producer in India, NTPC Ltd., is moving forward with the building of its first coal-fired plant in roughly six years as the need for the dirtiest fossil fuel increases due to the global energy crisis.<\/p>\n<p>According to those with knowledge of the situation, Bharat Heavy Electricals Ltd. submitted the lowest proposal for the construction of the 1,320 megawatt plant in the eastern state of Odisha.<\/p>\n<p>According to the persons, who asked not to be identified because the information has not yet been made public, NTPC is currently debating whether the state-run engineering business can speed up the project&#8217;s timeline.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report The largest power producer in India, NTPC Ltd., is moving forward with the building of its first coal-fired plant in roughly six years as the need for the dirtiest fossil&#8230; <\/p>\n","protected":false},"author":3,"featured_media":9908,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[237],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/07\/NTPC-set-to-award-first-coal-fired-plant-in-about-six-years.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/9907"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=9907"}],"version-history":[{"count":2,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/9907\/revisions"}],"predecessor-version":[{"id":17198,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/9907\/revisions\/17198"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/9908"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=9907"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=9907"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=9907"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}