{"id":9007,"date":"2022-06-15T05:18:01","date_gmt":"2022-06-15T05:18:01","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=9007"},"modified":"2023-06-17T07:10:18","modified_gmt":"2023-06-17T07:10:18","slug":"ntpc-to-start-commercial-operations-at-kawas-solar-project-in-gujarat","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/ntpc-to-start-commercial-operations-at-kawas-solar-project-in-gujarat\/","title":{"rendered":"NTPC to start commercial operations at Kawas Solar Project in Gujarat"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/9007?pdf=9007\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\" wp-image-7599 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/Tata-Power-Renewables-inaugurates-120MW-solar-project-in-Gujarat-300x167.jpg\" alt=\"\" width=\"446\" height=\"248\" srcset=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/Tata-Power-Renewables-inaugurates-120MW-solar-project-in-Gujarat-300x167.jpg 300w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/Tata-Power-Renewables-inaugurates-120MW-solar-project-in-Gujarat-1024x569.jpg 1024w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/Tata-Power-Renewables-inaugurates-120MW-solar-project-in-Gujarat-768x427.jpg 768w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/Tata-Power-Renewables-inaugurates-120MW-solar-project-in-Gujarat.jpg 1200w\" sizes=\"(max-width: 446px) 100vw, 446px\" \/><\/p>\n<p>The state-owned NTPC will start commercial operations at the Kawas Solar Project in Gujarat, which has a 15-megawatt solar capacity. According to NTPC, the capacity is part of the 56 MW Kawas Solar Project, which is located in Kawas in the state&#8217;s Surat region.<\/p>\n<p>&#8220;The second half capacity of 15 MW out of 56 MW Kawas Solar PV Project at Kawas has been declared on commercial operation with effect from 00:00 hours of 15.06.2022,&#8221; according to the company.<\/p>\n<p>NTPC&#8217;s standalone installed and commercial capacity will increase to 54,666.68 MW,<\/p>\n<p>while its group installed and commercial capacity will increase to 69,031.68 MW as a result of this.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report The state-owned NTPC will start commercial operations at the Kawas Solar Project in Gujarat, which has a 15-megawatt solar capacity. According to NTPC, the capacity is part of the 56&#8230; <\/p>\n","protected":false},"author":3,"featured_media":7599,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[237],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/Tata-Power-Renewables-inaugurates-120MW-solar-project-in-Gujarat.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/9007"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=9007"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/9007\/revisions"}],"predecessor-version":[{"id":9008,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/9007\/revisions\/9008"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/7599"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=9007"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=9007"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=9007"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}