{"id":896,"date":"2021-09-30T02:10:29","date_gmt":"2021-09-30T02:10:29","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=896"},"modified":"2021-10-06T02:15:07","modified_gmt":"2021-10-06T02:15:07","slug":"ccea-approves-doubling-of-the-nimach-ratlam-railway-route","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/ccea-approves-doubling-of-the-nimach-ratlam-railway-route\/","title":{"rendered":"CCEA approves doubling of the Nimach-Ratlam railway route"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/896?pdf=896\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/rail-lines.jpeg\" alt=\"Rail route\" \/><\/p>\n<p><span style=\"color: #222222;\"><span style=\"font-family: Arial, serif;\">The<strong> Cabinet Committee on Economic Affairs (CCEA)<\/strong> authorised the <strong>doubling of the Nimach-Ratlam railway line<\/strong> on Wednesday.<\/span><\/span><\/p>\n<p><span style=\"color: #222222;\"><span style=\"font-family: Arial, serif;\"><strong>Anurag Thakur<\/strong>,<strong> Minister of Information and Broadcasting, Sports and Youth Affairs<\/strong>, informed reporters following a Cabinet meeting that the overall projected cost of the project is 1,095.88 crore, and the escalated \/ completion cost is <strong>1,184.67 crore.<\/strong><\/span><\/span><\/p>\n<p><span style=\"color: #222222;\"><span style=\"font-family: Arial, serif;\">The capacity of the Nimach-Ratlam segment will be increased by doubling it. As a result, additional freight and passenger trains may be added to the system. Because of the closeness of cement factories, extra freight traffic of <strong>5.67 million tonnes<\/strong> per year is projected in the first year, increasing to <strong>9.45 mtpa<\/strong> in the eleventh year.<\/span><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report The Cabinet Committee on Economic Affairs (CCEA) authorised the doubling of the Nimach-Ratlam railway line on Wednesday. Anurag Thakur, Minister of Information and Broadcasting, Sports and Youth Affairs, informed reporters&#8230; <\/p>\n","protected":false},"author":1,"featured_media":897,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/rail-lines.jpeg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/896"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=896"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/896\/revisions"}],"predecessor-version":[{"id":898,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/896\/revisions\/898"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/897"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=896"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=896"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=896"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}