{"id":8563,"date":"2022-05-30T09:12:22","date_gmt":"2022-05-30T09:12:22","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=8563"},"modified":"2023-01-31T11:13:22","modified_gmt":"2023-01-31T11:13:22","slug":"lt-bags-another-contract-for-cmrl","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/lt-bags-another-contract-for-cmrl\/","title":{"rendered":"L&#038;T bags another contract for CMRL"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/8563?pdf=8563\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\" wp-image-4164 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/01\/LTs-hydrocarbon.jpg\" alt=\"\" width=\"415\" height=\"284\" \/><\/p>\n<p>Larsen and Toubro (L&amp;T), an infrastructure company, said that it has obtained another large contract order for the Chennai Metro Rail Project.<\/p>\n<p>A substantial order, according to the company&#8217;s project categorization, is worth between Rs 1,000 crore and Rs 2,500 crore.<\/p>\n<p>&#8220;L&amp;T Construction has been granted another significant contract for the Chennai Metro Rail Project (CMRL),&#8221; according to a statement from the company.<\/p>\n<p>The order calls for the building of a 10-kilometer elevated viaduct with an elevated ramp and ten elevated metro stations at Nehru Nagar, Kandanchavadi, Perungudi, Thoraipakkam, Mettukuppam, PTC colony, Okkiyampet, Karapakkam, Okkiyam Thoraipakkam, and Sholinganallur, among others.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Larsen and Toubro (L&amp;T), an infrastructure company, said that it has obtained another large contract order for the Chennai Metro Rail Project. A substantial order, according to the company&#8217;s project&#8230; <\/p>\n","protected":false},"author":3,"featured_media":4164,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[1167],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/01\/LTs-hydrocarbon.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/8563"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=8563"}],"version-history":[{"count":2,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/8563\/revisions"}],"predecessor-version":[{"id":8565,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/8563\/revisions\/8565"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/4164"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=8563"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=8563"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=8563"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}