{"id":8548,"date":"2022-05-30T06:46:38","date_gmt":"2022-05-30T06:46:38","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=8548"},"modified":"2023-01-31T11:16:55","modified_gmt":"2023-01-31T11:16:55","slug":"jk-infraprojects-announces-rol-from-ircon-international","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/jk-infraprojects-announces-rol-from-ircon-international\/","title":{"rendered":"JK Infraprojects announces ROL from Ircon International"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/8548?pdf=8548\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\" wp-image-8549 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/JK-Infraprojects-announces-ROL-from-Ircon-International.jpg\" alt=\"\" width=\"474\" height=\"263\" \/><\/p>\n<p>J Kumar Infraprojects Ltd announces receipt of Letter of Acceptance from Ircon International Limited for Construction of Eight lane access-controlled Expressway from Km 69.800 Km 79.783 (Bhoj to Morbe Section- SPUR of Vadodara Mumbai Expressway including 4.160 km long twin tube eight-lane tunnel in Matheran Eco-sensitive Zone in the State of Maharashtra ON EPC MODE under Bharatmala Pariyojna (Phase II-Package XVII)- Letter of Acceptance (LOA) for a total Lumpsum contract price of Rs. 10679000000.000 (Rupees Ten Hundred Sixty Seven Crore Ninety Lacs only) exclusive of Goods and Service Tax.<\/p>\n<p>J Kumar Infraprojects Ltd is a Civil Engineering company located in Veera Desai Road, Mumbai, Maharashtra, India.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report J Kumar Infraprojects Ltd announces receipt of Letter of Acceptance from Ircon International Limited for Construction of Eight lane access-controlled Expressway from Km 69.800 Km 79.783 (Bhoj to Morbe Section-&#8230; <\/p>\n","protected":false},"author":3,"featured_media":8549,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[931,1171],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/JK-Infraprojects-announces-ROL-from-Ircon-International.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/8548"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=8548"}],"version-history":[{"count":2,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/8548\/revisions"}],"predecessor-version":[{"id":14381,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/8548\/revisions\/14381"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/8549"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=8548"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=8548"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=8548"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}