{"id":854,"date":"2021-09-28T00:05:32","date_gmt":"2021-09-28T00:05:32","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=854"},"modified":"2021-10-06T00:12:06","modified_gmt":"2021-10-06T00:12:06","slug":"yotta-infra-to-invest-rs-900-crore-in-edge-datacenter-network","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/yotta-infra-to-invest-rs-900-crore-in-edge-datacenter-network\/","title":{"rendered":"Yotta Infra to invest Rs 900 crore in Edge datacenter network"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/854?pdf=854\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/data-center-network.jpg\" alt=\"Yotta Infra to invest Rs 900 crore in Edge datacenter network\" \/><\/p>\n<p><span style=\"color: #222222;\"><span style=\"font-family: Arial, serif;\">The Hiranandani Group&#8217;s <strong>Yotta Infrastructure<\/strong> would invest <strong>Rs 900 crore<\/strong> over three to four years to<strong> build 100 Edge datacenters<\/strong>.<\/span><\/span><\/p>\n<p><span style=\"color: #222222;\"><span style=\"font-family: Arial, serif;\">The firm would begin with eight to ten cities, with each facility costing around <strong>Rs 8 to 10 crore<\/strong> for basic infrastructure. The business is looking at 25 minor cities in Phase-I, including <strong>Nagpur, Coimbatore, Ranchi<\/strong>\u00a0and <strong>Jaipur.<\/strong><\/span><\/span><\/p>\n<p><span style=\"color: #222222;\"><span style=\"font-family: Arial, serif;\">The company operates <strong>Tier IV<\/strong> data centre parks in<strong> Mumbai, Navi Mumbai, and Chennai.<\/strong> Two versions have been developed by the business. In the first scenario, an edge datacenter will be established in an existing building. According to rumours, the second model will be a container-based greenfield project.<\/span><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report The Hiranandani Group&#8217;s Yotta Infrastructure would invest Rs 900 crore over three to four years to build 100 Edge datacenters. The firm would begin with eight to ten cities, with&#8230; <\/p>\n","protected":false},"author":1,"featured_media":855,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/data-center-network.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/854"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=854"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/854\/revisions"}],"predecessor-version":[{"id":856,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/854\/revisions\/856"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/855"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=854"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=854"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=854"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}