{"id":8454,"date":"2022-05-25T05:16:18","date_gmt":"2022-05-25T05:16:18","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=8454"},"modified":"2023-01-31T12:01:19","modified_gmt":"2023-01-31T12:01:19","slug":"va-tech-wabag-signs-contract-for-ttro-plant-in-ghaziabad","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/va-tech-wabag-signs-contract-for-ttro-plant-in-ghaziabad\/","title":{"rendered":"Va Tech Wabag signs contract for TTRO plant in Ghaziabad"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/8454?pdf=8454\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\" wp-image-8455 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/Va-Tech-Wabag-signs-contract-300x187.jpg\" alt=\"\" width=\"435\" height=\"271\" srcset=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/Va-Tech-Wabag-signs-contract-300x187.jpg 300w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/Va-Tech-Wabag-signs-contract-1024x639.jpg 1024w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/Va-Tech-Wabag-signs-contract-768x479.jpg 768w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/Va-Tech-Wabag-signs-contract.jpg 1200w\" sizes=\"(max-width: 435px) 100vw, 435px\" \/><\/p>\n<p>Va Tech Wabag has signed a concession agreement with Ghaziabad Nagar Nigam (GNN) for the Design, Build, Finance, and Operation of a new 40 MLD Recycle and Re-use Tertiary Treatment Reverse Osmosis (TTRO) plant and associated infrastructure under the Hybrid Annuity Model (HAM) in Ghaziabad through its wholly owned subsidiary Ghaziabad Water Solutions Pvt. Ltd.<\/p>\n<p>Wabag will serve as the project&#8217;s technical partner and will carry out the Design-Build-Operate (DBO) contract with SPV for Rs. 594 crore, according to a release.<\/p>\n<p>The building phase of the project will last two years, followed by a 15-year operating and maintenance period. During the building phase, GNN, which has generated funds through India&#8217;s first municipal Green Bond, will provide a grant to this project.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Va Tech Wabag has signed a concession agreement with Ghaziabad Nagar Nigam (GNN) for the Design, Build, Finance, and Operation of a new 40 MLD Recycle and Re-use Tertiary Treatment&#8230; <\/p>\n","protected":false},"author":3,"featured_media":8455,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[1123,1187],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/Va-Tech-Wabag-signs-contract.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/8454"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=8454"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/8454\/revisions"}],"predecessor-version":[{"id":8456,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/8454\/revisions\/8456"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/8455"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=8454"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=8454"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=8454"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}