{"id":8333,"date":"2022-05-20T06:26:38","date_gmt":"2022-05-20T06:26:38","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=8333"},"modified":"2023-02-02T11:27:05","modified_gmt":"2023-02-02T11:27:05","slug":"7-firms-bid-for-chennai-metro-line-3s-sholinganallur-sipcot-section","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/7-firms-bid-for-chennai-metro-line-3s-sholinganallur-sipcot-section\/","title":{"rendered":"7 firms bid for Chennai Metro Line 3\u2019s Sholinganallur \u2013 SIPCOT Section"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/8333?pdf=8333\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\" wp-image-8334 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/7-firms-bid-for-Chennai-Metro-Line-3s-Sholinganallur-\u2013-SIPCOT-Section-210x300.jpg\" alt=\"\" width=\"265\" height=\"379\" srcset=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/7-firms-bid-for-Chennai-Metro-Line-3s-Sholinganallur-\u2013-SIPCOT-Section-210x300.jpg 210w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/7-firms-bid-for-Chennai-Metro-Line-3s-Sholinganallur-\u2013-SIPCOT-Section.jpg 600w\" sizes=\"(max-width: 265px) 100vw, 265px\" \/><\/p>\n<p>After CMRL launched technical bids for Package C3-ECV-01\/RT-01, 7 construction firms filed proposals to build the 10.13 km Sholinganallur Lake \u2013 SIPCOT 2 segment of Chennai Metro Line-3.<\/p>\n<p>This package of the 118.9-kilometer Chennai Metro Phase 2 project includes nine elevated stations at the southern terminus of the 45.8-kilometer Line-3, which will connect Madhavaram to SIPCOT 2 through 49 stops.<\/p>\n<p>An earlier idea for a railway repair depot at SIPCOT was scrapped in 2020. An elevated stabling yard, identical to the one built at Wimco Nagar for the 9.051 km Phase 1 Extension project, has already taken its position.<\/p>\n<p>The package was originally advertised in January 2021, with a 36-month timetable and an unknown estimate.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report After CMRL launched technical bids for Package C3-ECV-01\/RT-01, 7 construction firms filed proposals to build the 10.13 km Sholinganallur Lake \u2013 SIPCOT 2 segment of Chennai Metro Line-3. This package&#8230; <\/p>\n","protected":false},"author":3,"featured_media":8334,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[851,343],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/7-firms-bid-for-Chennai-Metro-Line-3s-Sholinganallur-\u2013-SIPCOT-Section.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/8333"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=8333"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/8333\/revisions"}],"predecessor-version":[{"id":8335,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/8333\/revisions\/8335"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/8334"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=8333"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=8333"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=8333"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}