{"id":8250,"date":"2022-05-18T07:25:33","date_gmt":"2022-05-18T07:25:33","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=8250"},"modified":"2023-02-02T11:45:47","modified_gmt":"2023-02-02T11:45:47","slug":"ashoka-baswantpur-singnodi-signs-mou-with-nhai","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/ashoka-baswantpur-singnodi-signs-mou-with-nhai\/","title":{"rendered":"Ashoka Baswantpur Singnodi signs MoU with NHAI"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/8250?pdf=8250\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\" wp-image-8251 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/Ashoka-Baswantpur-Singnodi-signs-MoU-with-NHAI.jpg\" alt=\"\" width=\"474\" height=\"263\" \/><\/p>\n<p>Ashoka Baswantpur Singnodi Road Private Limited (&#8216;SPV&#8217;), a wholly owned subsidiary of <a href=\"https:\/\/www.ashokabuildcon.com\/\" target=\"_blank\" rel=\"nofollow noopener\">Ashoka Buildcon Limited<\/a> (&#8216;the Company&#8217;), signed a Concession Agreement for the Project with the <a href=\"https:\/\/nhai.gov.in\/\">National Highways Authority of India<\/a> (&#8216;NHAI&#8217;).<\/p>\n<p>Development of 6 lane Access Controlled Greenfield Highways on Hybrid Annuity Mode (HAM) under Bharatmala Pariyojana from KM 162.500 to KM 203.100 Baswantpur to Singnodi stretch of NH-150C (Package IV of Akkalkot-KNT\/TS Border)&#8217;.<\/p>\n<p>As required by the Concession Agreement, the SPV was formed as a fully owned subsidiary of the Company to carry out this project. The project cost accepted in the bid is Rs.1,079.00 crore.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Ashoka Baswantpur Singnodi Road Private Limited (&#8216;SPV&#8217;), a wholly owned subsidiary of Ashoka Buildcon Limited (&#8216;the Company&#8217;), signed a Concession Agreement for the Project with the National Highways Authority of&#8230; <\/p>\n","protected":false},"author":3,"featured_media":8251,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[1235,509],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/Ashoka-Baswantpur-Singnodi-signs-MoU-with-NHAI.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/8250"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=8250"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/8250\/revisions"}],"predecessor-version":[{"id":8252,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/8250\/revisions\/8252"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/8251"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=8250"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=8250"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=8250"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}