{"id":8113,"date":"2022-05-16T11:25:19","date_gmt":"2022-05-16T11:25:19","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=8113"},"modified":"2023-02-02T11:55:56","modified_gmt":"2023-02-02T11:55:56","slug":"nhpc-awards-contracts-for-1000-mw-solar-project-to-adani-infra-tata-power-solar-systems-and-ssel-asr-jv","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/nhpc-awards-contracts-for-1000-mw-solar-project-to-adani-infra-tata-power-solar-systems-and-ssel-asr-jv\/","title":{"rendered":"NHPC awards contracts for 1,000-MW solar project to Adani Infra, Tata Power Solar Systems, and SSEL-ASR JV"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/8113?pdf=8113\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\" wp-image-3147 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/12\/tata-power-solar-300x200.jpeg\" alt=\"\" width=\"444\" height=\"296\" srcset=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/12\/tata-power-solar-300x200.jpeg 300w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/12\/tata-power-solar-1024x683.jpeg 1024w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/12\/tata-power-solar-768x512.jpeg 768w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/12\/tata-power-solar.jpeg 1200w\" sizes=\"(max-width: 444px) 100vw, 444px\" \/><\/p>\n<p>Adani Infra, <a title=\"Tata Power Solar Systems\" href=\"https:\/\/www.tatapowersolar.com\/\" target=\"_blank\" rel=\"nofollow noopener\">Tata Power Solar Systems<\/a>, and SSEL-ASR JV have been granted engineering, procurement, and construction (EPC) contracts for Rs 6,604.42 crore by the state-run NHPC for a 1,000 MW solar project and transmission line. According to a BSE filing, the completion period is 18 months.<\/p>\n<p>Under Tranche-III of CPSU Scheme Phase-11, <a href=\"https:\/\/newprojectstracker.com\/blog\/2022\/02\/11\/nhpc-signs-agreement-to-build-10000-mw-renewable-energy-capacity-in-rajasthan\/\" target=\"_blank\" rel=\"noopener\">NHPC<\/a> Ltd has awarded EPC contracts for the development of grid linked solar PV project (1,000 MW capacity) and transmission line for electricity evacuation to ISTS sub-station, as well as full operations and maintenance for 5 years.<\/p>\n<p>It stated that letters of award were given with a total contract price of Rs 6,604.42 crore.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Adani Infra, Tata Power Solar Systems, and SSEL-ASR JV have been granted engineering, procurement, and construction (EPC) contracts for Rs 6,604.42 crore by the state-run NHPC for a 1,000 MW&#8230; <\/p>\n","protected":false},"author":3,"featured_media":3147,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[1],"tags":[485,362],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/12\/tata-power-solar.jpeg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/8113"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=8113"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/8113\/revisions"}],"predecessor-version":[{"id":8114,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/8113\/revisions\/8114"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/3147"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=8113"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=8113"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=8113"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}