{"id":7812,"date":"2022-05-10T07:25:53","date_gmt":"2022-05-10T07:25:53","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=7812"},"modified":"2023-02-06T06:03:19","modified_gmt":"2023-02-06T06:03:19","slug":"sjvn-bags-contract-for-30-mw-wind-solar-hybrid-project","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/sjvn-bags-contract-for-30-mw-wind-solar-hybrid-project\/","title":{"rendered":"SJVN bags contract for 30 MW wind-solar hybrid project"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/7812?pdf=7812\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\" wp-image-7599 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/Tata-Power-Renewables-inaugurates-120MW-solar-project-in-Gujarat-300x167.jpg\" alt=\"\" width=\"499\" height=\"278\" srcset=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/Tata-Power-Renewables-inaugurates-120MW-solar-project-in-Gujarat-300x167.jpg 300w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/Tata-Power-Renewables-inaugurates-120MW-solar-project-in-Gujarat-1024x569.jpg 1024w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/Tata-Power-Renewables-inaugurates-120MW-solar-project-in-Gujarat-768x427.jpg 768w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/Tata-Power-Renewables-inaugurates-120MW-solar-project-in-Gujarat.jpg 1200w\" sizes=\"(max-width: 499px) 100vw, 499px\" \/><\/p>\n<p>SJVN said that it has received a contract for Rs 195 crore for the construction of its first wind-solar hybrid project, with a capacity of 30 MW. &#8220;Through a tender issued by <a title=\"Solar Energy Corporation of India Ltd\" href=\"https:\/\/www.seci.co.in\/\" target=\"_blank\" rel=\"nofollow noopener\">Solar Energy Corporation of India Ltd<\/a> (SECI), the company has secured its first ever 30 MW wind-solar hybrid project,&#8221; SJVN stated in a BSE filing.<\/p>\n<p>The project was selected through a tariff-based competitive bidding procedure to provide power at a rate of Rs 2.54 per unit on a build, own, and operate basis, according to the business, with a projected cost of Rs 195 crore for construction and development.<\/p>\n<p>The project is expected to generate 79 MUs (Million Units) in the first year, and on cumulative basis, approximately 1,860 MUs would be generated over a period of 25 years.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report SJVN said that it has received a contract for Rs 195 crore for the construction of its first wind-solar hybrid project, with a capacity of 30 MW. &#8220;Through a tender&#8230; <\/p>\n","protected":false},"author":3,"featured_media":7599,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[284],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/Tata-Power-Renewables-inaugurates-120MW-solar-project-in-Gujarat.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/7812"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=7812"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/7812\/revisions"}],"predecessor-version":[{"id":7813,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/7812\/revisions\/7813"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/7599"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=7812"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=7812"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=7812"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}