{"id":7169,"date":"2022-04-30T04:44:48","date_gmt":"2022-04-30T04:44:48","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=7169"},"modified":"2023-06-17T09:23:48","modified_gmt":"2023-06-17T09:23:48","slug":"renew-power-signs-5-ppas-to-supply-about-1500-mw-solar-energy","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/renew-power-signs-5-ppas-to-supply-about-1500-mw-solar-energy\/","title":{"rendered":"ReNew Power signs 5 PPAs to supply about 1,500 MW solar energy"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/7169?pdf=7169\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\" wp-image-6782 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/04\/JSL-to-invest-in-renewable-energy-sector-plans-to-build-300-MW-solar-and-wind-capacity-in-3-states.jpg\" alt=\"\" width=\"495\" height=\"278\" \/><\/p>\n<p>ReNew Power said that it has signed five power purchase agreements (PPAs) for the provision of approximately 1,500 MW of solar-generated electricity.<\/p>\n<p>According to a business release, the company has inked power purchase agreements with Solar Energy Corporation of India (SECI) and Punjab State Power Corporation Ltd (PSPCL), as well as other long-term purchase agreements with corporate purchasers totaling over 2 GW.<\/p>\n<p>As a result, the company&#8217;s gross total portfolio has increased to 12.1 GW, up from 10.2 GW at the start of the year.<\/p>\n<p>The new utility solar projects will be located in Rajasthan, in western India, and will have flat prices for a period of 25 years.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report ReNew Power said that it has signed five power purchase agreements (PPAs) for the provision of approximately 1,500 MW of solar-generated electricity. According to a business release, the company has&#8230; <\/p>\n","protected":false},"author":3,"featured_media":6782,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[284],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/04\/JSL-to-invest-in-renewable-energy-sector-plans-to-build-300-MW-solar-and-wind-capacity-in-3-states.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/7169"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=7169"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/7169\/revisions"}],"predecessor-version":[{"id":7170,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/7169\/revisions\/7170"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/6782"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=7169"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=7169"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=7169"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}