{"id":703,"date":"2021-09-27T09:41:27","date_gmt":"2021-09-27T09:41:27","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=703"},"modified":"2021-10-03T09:46:13","modified_gmt":"2021-10-03T09:46:13","slug":"ahluwalia-contracts-bags-rs-58-80-crore-worth-project-to-construct-infosys-office","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/ahluwalia-contracts-bags-rs-58-80-crore-worth-project-to-construct-infosys-office\/","title":{"rendered":"Ahluwalia Contracts bags Rs 58.80 crore worth project to construct Infosys office"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/703?pdf=703\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/infosys.jpg\" alt=\"Infosys Office\" \/><\/p>\n<p><span style=\"color: #222222;\"><span style=\"font-family: Arial, serif;\"><strong>Ahluwalia Contracts<\/strong> (India) has bagged new order aggregating to<strong> Rs 58.80 crore.<\/strong><\/span><\/span><\/p>\n<p><span style=\"color: #222222;\"><span style=\"font-family: Arial, serif;\">The order is \u00a0for <strong>construction of Infosys Regional Office Building<\/strong> for Software Development Block (SDB) at <strong>Kolkata (West Bengal)<\/strong>.<\/span><\/span><\/p>\n<p><span style=\"color: #222222;\"><span style=\"font-family: Arial, serif;\">The company&#8217;s total order inflow during the FY 2021-22 stands at <strong>Rs 1198.66 crore.<\/strong><\/span><\/span><\/p>\n<p><span style=\"color: #222222;\"><span style=\"font-family: Arial, serif;\">Ahluwalia Contracts (India) is engaged in providing construction related services including design on turnkey basis and assuring timely completion of projects within budget and with excellent quality.<\/span><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Ahluwalia Contracts (India) has bagged new order aggregating to Rs 58.80 crore. The order is \u00a0for construction of Infosys Regional Office Building for Software Development Block (SDB) at Kolkata (West&#8230; <\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[],"jetpack_featured_media_url":"","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/703"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=703"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/703\/revisions"}],"predecessor-version":[{"id":705,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/703\/revisions\/705"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=703"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=703"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=703"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}