{"id":6815,"date":"2022-04-22T05:47:48","date_gmt":"2022-04-22T05:47:48","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=6815"},"modified":"2023-06-17T10:08:54","modified_gmt":"2023-06-17T10:08:54","slug":"hitachi-bags-contract-to-overhaul-mp-power-system","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/hitachi-bags-contract-to-overhaul-mp-power-system\/","title":{"rendered":"Hitachi bags contract to overhaul MP power system"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/6815?pdf=6815\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\" wp-image-6816 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/04\/Hitachi-bags-contract-to-overhaul-MP-power-system.jpg\" alt=\"\" width=\"489\" height=\"274\" \/><\/p>\n<p>MP Power Transmission Package-II has awarded Hitachi Energy a Rs 160 crore contract to overhaul the Madhya Pradesh power system. According to a company statement, MP Electricity Transmission Package-II Ltd is a project-specific firm that aims to upgrade the transmission system in rural parts of Madhya Pradesh in order to increase capacity and reliability of the region&#8217;s power infrastructure.<\/p>\n<p>The order was placed in the third quarter of the year.<\/p>\n<p>According to the statement, the order for nine grid connections would improve a power transmission network that spans over 1,000 kilometres of overhead lines throughout nine rural districts of Madhya Pradesh.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report MP Power Transmission Package-II has awarded Hitachi Energy a Rs 160 crore contract to overhaul the Madhya Pradesh power system. According to a company statement, MP Electricity Transmission Package-II Ltd&#8230; <\/p>\n","protected":false},"author":3,"featured_media":6816,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[821],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/04\/Hitachi-bags-contract-to-overhaul-MP-power-system.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/6815"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=6815"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/6815\/revisions"}],"predecessor-version":[{"id":6817,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/6815\/revisions\/6817"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/6816"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=6815"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=6815"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=6815"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}