{"id":6582,"date":"2022-04-12T05:34:00","date_gmt":"2022-04-12T05:34:00","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=6582"},"modified":"2023-06-17T10:55:13","modified_gmt":"2023-06-17T10:55:13","slug":"gsecl-issues-request-for-proposal-to-build-a-gas-insulated-substation-at-khavda-re-park","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/gsecl-issues-request-for-proposal-to-build-a-gas-insulated-substation-at-khavda-re-park\/","title":{"rendered":"GSECL issues request for proposal to build a gas-insulated substation at Khavda RE Park"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/6582?pdf=6582\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\" wp-image-6584 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/04\/hv-gis-gas-insulated-switchgear-components-1-300x201.jpg\" alt=\"\" width=\"418\" height=\"280\" srcset=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/04\/hv-gis-gas-insulated-switchgear-components-1-300x201.jpg 300w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/04\/hv-gis-gas-insulated-switchgear-components-1-1024x686.jpg 1024w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/04\/hv-gis-gas-insulated-switchgear-components-1-768x515.jpg 768w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/04\/hv-gis-gas-insulated-switchgear-components-1.jpg 1074w\" sizes=\"(max-width: 418px) 100vw, 418px\" \/><\/p>\n<p>The <a title=\"Gujarat State Electricity Corporation\" href=\"https:\/\/www.gsecl.in\/\">Gujarat State Electricity Corporation<\/a> (GSECL) has issued a request for proposals for the building of a gas-insulated substation for the South Block of the 3,325 MW Renewable Energy Park at Khavda in Gujarat&#8217;s Kachchh district.<\/p>\n<p>On a turnkey basis, the scope of work includes design, engineering, manufacturing, supply, erection, testing, and commissioning of a 33\/440 kV gas insulated substation, three winding 33-33\/400 KV power transformers, and a 400 kV transmission line, as well as all civil works and a ten-year operation and maintenance period.<\/p>\n<p>The project is anticipated to cost Rs 325.67 crore and would take 14 months to complete.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report The Gujarat State Electricity Corporation (GSECL) has issued a request for proposals for the building of a gas-insulated substation for the South Block of the 3,325 MW Renewable Energy Park&#8230; <\/p>\n","protected":false},"author":3,"featured_media":6584,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[2234],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/04\/hv-gis-gas-insulated-switchgear-components-1.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/6582"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=6582"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/6582\/revisions"}],"predecessor-version":[{"id":6585,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/6582\/revisions\/6585"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/6584"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=6582"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=6582"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=6582"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}