{"id":6376,"date":"2022-04-05T04:39:59","date_gmt":"2022-04-05T04:39:59","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=6376"},"modified":"2023-06-19T05:07:05","modified_gmt":"2023-06-19T05:07:05","slug":"jsw-energy-limited-signs-mou-with-chhattisgarh-government","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/jsw-energy-limited-signs-mou-with-chhattisgarh-government\/","title":{"rendered":"JSW Energy limited signs MoU with Chhattisgarh government"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/6376?pdf=6376\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\" wp-image-6377 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/04\/JSW-Energy-limited-signs-MoU-with-Chhattisgarh-government.jpg\" alt=\"\" width=\"489\" height=\"306\" \/><\/p>\n<p><a title=\"JSW Energy Limited\" href=\"https:\/\/www.jsw.in\/energy\">JSW Energy Limited<\/a>, through its wholly owned subsidiary, JSW Neo Energy, has signed a Memorandum of Understanding (MoU) with the government of Chhattisgarh for the construction of a 1,000 MW Hydro Pumped Storage Project in Chhattisgarh, dubbed Hasdev Bango Pumped Storage Project.<\/p>\n<p>With the fast expansion of renewable energy capacity in the country, energy storage options such as Hydro Pumped Storage Projects (PSP) have become necessary to meet the country&#8217;s intermittent power needs.<\/p>\n<p>Hydro Pumped Storage is a proven technology that delivers enough peaking power reserves, dependable grid operation, energy balancing, and storage capacity.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report JSW Energy Limited, through its wholly owned subsidiary, JSW Neo Energy, has signed a Memorandum of Understanding (MoU) with the government of Chhattisgarh for the construction of a 1,000 MW&#8230; <\/p>\n","protected":false},"author":3,"featured_media":6377,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[914],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/04\/JSW-Energy-limited-signs-MoU-with-Chhattisgarh-government.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/6376"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=6376"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/6376\/revisions"}],"predecessor-version":[{"id":6378,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/6376\/revisions\/6378"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/6377"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=6376"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=6376"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=6376"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}