{"id":6333,"date":"2022-04-04T05:09:59","date_gmt":"2022-04-04T05:09:59","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=6333"},"modified":"2023-06-19T05:12:38","modified_gmt":"2023-06-19T05:12:38","slug":"mumbai-metro-rail-3-underground-project-to-take-at-least-2-more-years-to-complete","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/mumbai-metro-rail-3-underground-project-to-take-at-least-2-more-years-to-complete\/","title":{"rendered":"Mumbai Metro rail-3 underground project to take at least 2 more years to complete"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/6333?pdf=6333\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\" wp-image-6334 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/04\/Mumbai-Metro-rail-3-underground-project-to-take-at-least-2-more-years-to-complete.jpg\" alt=\"\" width=\"449\" height=\"300\" \/><\/p>\n<p>According to a senior official of the <a title=\"Mumbai Metropolitan Region Development Authority\" href=\"https:\/\/mmrda.maharashtra.gov.in\/home\">Mumbai Metropolitan Region Development Authority<\/a> (MMRDA), the Colaba-SEEPZ metro train line-3 may take another two to two-and-a-half years to complete since sections of the tunnel boring work and station building are still waiting.<\/p>\n<p>Once finished, the city&#8217;s first underground metro line would connect south Mumbai and the western suburbs to the city airport, easing traffic congestion for outlying residents.<\/p>\n<p>Addressing a press conference, <a href=\"https:\/\/mmrda.maharashtra.gov.in\/home\" rel=\"nofollow \">MMRDA&#8217;s<\/a> metropolitan commissioner SVR Srinivas said, &#8220;Mumbai metro line 3 will take at least another two to two-and-a-half years to complete as a lot of work remains other than the depot.&#8221;<\/p>\n<p>&#8220;Another 1.5 km-long tunnel boring work on the 33.5 km line is pending, apart from construction of the stations and other work including signalling, telecommunications, overhead wires and control center&#8221;, he added.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report According to a senior official of the Mumbai Metropolitan Region Development Authority (MMRDA), the Colaba-SEEPZ metro train line-3 may take another two to two-and-a-half years to complete since sections of&#8230; <\/p>\n","protected":false},"author":3,"featured_media":6334,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[504],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/04\/Mumbai-Metro-rail-3-underground-project-to-take-at-least-2-more-years-to-complete.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/6333"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=6333"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/6333\/revisions"}],"predecessor-version":[{"id":6335,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/6333\/revisions\/6335"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/6334"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=6333"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=6333"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=6333"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}