{"id":6210,"date":"2022-03-30T05:19:31","date_gmt":"2022-03-30T05:19:31","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=6210"},"modified":"2023-06-19T05:28:48","modified_gmt":"2023-06-19T05:28:48","slug":"ashoka-buildcon-becomes-lowest-bidder-for-nhai-ham-project","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/ashoka-buildcon-becomes-lowest-bidder-for-nhai-ham-project\/","title":{"rendered":"Ashoka Buildcon becomes lowest bidder for NHAI HAM project"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/6210?pdf=6210\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\" wp-image-6211 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/03\/Ashoka-Buildcon-becomes-lowest-bidder-for-NHAI-HAM-project-300x165.jpg\" alt=\"\" width=\"481\" height=\"266\" \/><\/p>\n<p>&#8216;Development of 6 lane Access Controlled Greenfield highway from KM 162.500 to KM 203.100, Baswantpur to Singondi Section of NH 150 C (Package 4 of Akkalkot KNT of TS Border) on Hybrid Annuity Mode (HAM) under Bharatmala Pariyojana&#8217; was the project that <a href=\"https:\/\/www.ashokabuildcon.com\/\" target=\"_blank\" rel=\"noopener\">Ashoka Buildcon Limited<\/a> submitted to the National Highways Authority of India.<\/p>\n<p>At the Financial Bid opening meeting in New Delhi on March 29, 2022, the Company was named &#8220;the Lowest Bidder.&#8221; The project&#8217;s estimated bid project cost is Rs.1,079 crore.<\/p>\n<p>From the scheduled date, the construction time is 912 days.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report &#8216;Development of 6 lane Access Controlled Greenfield highway from KM 162.500 to KM 203.100, Baswantpur to Singondi Section of NH 150 C (Package 4 of Akkalkot KNT of TS Border)&#8230; <\/p>\n","protected":false},"author":3,"featured_media":6211,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[1235],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/03\/Ashoka-Buildcon-becomes-lowest-bidder-for-NHAI-HAM-project.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/6210"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=6210"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/6210\/revisions"}],"predecessor-version":[{"id":6212,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/6210\/revisions\/6212"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/6211"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=6210"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=6210"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=6210"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}