{"id":6083,"date":"2022-03-28T04:45:30","date_gmt":"2022-03-28T04:45:30","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=6083"},"modified":"2023-06-19T05:46:07","modified_gmt":"2023-06-19T05:46:07","slug":"ntpc-commissions-third-component-capacity-of-42-5-mw-of-100-mw-ramagundam-floating-solar-pv-project","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/ntpc-commissions-third-component-capacity-of-42-5-mw-of-100-mw-ramagundam-floating-solar-pv-project\/","title":{"rendered":"NTPC commissions third component capacity of 42.5 MW of 100 MW Ramagundam floating solar PV Project"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/6083?pdf=6083\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\" wp-image-6084 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/03\/NTPC-commissions-third-component-capacity-of-42.5-MW-of-100-MW-Ramagundam-floating-solar-PV-Project.jpg\" alt=\"\" width=\"470\" height=\"263\" \/><\/p>\n<p>NTPC announced the successful commissioning of the third component capacity of 42.5 MW of the 100 MW Ramagundam Floating Solar PV Project at Ramagundam, Telangana.<\/p>\n<p>NTPC now has a standalone installed and commercial capacity of 54494.68 MW.<\/p>\n<p>In addition, NTPC&#8217;s total installed and commercial capacity has increased to 68609.68 and 67949.68 MW, respectively.<\/p>\n<p><a title=\"NTPC Limited\" href=\"https:\/\/www.ntpc.co.in\/\">NTPC Limited<\/a>, formerly known as <a title=\"National Thermal Power Corporation Limited\" href=\"https:\/\/www.ntpc.co.in\/\" rel=\"nofollow \">National Thermal Power Corporation Limited<\/a>, is an Indian statutory corporation. It is engaged in generation of electricity and allied activities. It is a statutory corporation incorporated under the Companies Act 1956 and is under the ownership of Ministry of Power, Government of India<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report NTPC announced the successful commissioning of the third component capacity of 42.5 MW of the 100 MW Ramagundam Floating Solar PV Project at Ramagundam, Telangana. NTPC now has a standalone&#8230; <\/p>\n","protected":false},"author":3,"featured_media":6084,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[1119],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/03\/NTPC-commissions-third-component-capacity-of-42.5-MW-of-100-MW-Ramagundam-floating-solar-PV-Project.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/6083"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=6083"}],"version-history":[{"count":4,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/6083\/revisions"}],"predecessor-version":[{"id":17252,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/6083\/revisions\/17252"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/6084"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=6083"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=6083"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=6083"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}