{"id":6065,"date":"2022-03-26T05:19:28","date_gmt":"2022-03-26T05:19:28","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=6065"},"modified":"2023-06-19T05:46:46","modified_gmt":"2023-06-19T05:46:46","slug":"ntpc-commercialises-an-extra-42-5-mw-of-electricity-output-capacity","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/ntpc-commercialises-an-extra-42-5-mw-of-electricity-output-capacity\/","title":{"rendered":"NTPC commercialises an extra 42.5 MW of electricity output capacity"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/6065?pdf=6065\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\" wp-image-6066 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/03\/ntpc-agencies-300x225.jpg\" alt=\"\" width=\"412\" height=\"310\" srcset=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/03\/ntpc-agencies-300x225.jpg 300w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/03\/ntpc-agencies-1024x768.jpg 1024w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/03\/ntpc-agencies-768x576.jpg 768w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/03\/ntpc-agencies.jpg 1200w\" sizes=\"(max-width: 412px) 100vw, 412px\" \/><\/p>\n<p>At the Ramagundam floating solar project in Telangana, state-run power firm NTPC has commercialised an extra 42.5 MW of electricity output capacity.<\/p>\n<p>The Ramagundam floating solar project was previously commissioned at 17.5 MW (Part-I) and 20 MW (Part-II).<\/p>\n<p>The Ramagundam project now has a total commercially operational power generating capacity of 80 MW, thanks to the addition of 42.5 MW. The project has a capacity of 100 MW.<\/p>\n<p>&#8220;Consequent upon successful commissioning, third part capacity of 42.5 MW of 100 MW Ramagundam Floating Solar PV Project at Ramagundam, Telangana, is declared on commercial operation with effect from 00:00 hrs. of March 24, 2022,&#8221; NTPC said in a BSE filing.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report At the Ramagundam floating solar project in Telangana, state-run power firm NTPC has commercialised an extra 42.5 MW of electricity output capacity. The Ramagundam floating solar project was previously commissioned&#8230; <\/p>\n","protected":false},"author":3,"featured_media":6066,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[237],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/03\/ntpc-agencies.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/6065"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=6065"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/6065\/revisions"}],"predecessor-version":[{"id":6067,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/6065\/revisions\/6067"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/6066"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=6065"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=6065"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=6065"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}