{"id":5961,"date":"2022-03-23T07:16:45","date_gmt":"2022-03-23T07:16:45","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=5961"},"modified":"2023-06-19T05:55:57","modified_gmt":"2023-06-19T05:55:57","slug":"gr-infraprojects-becomes-l-1-bidder-for-nhai-project-in-mp","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/gr-infraprojects-becomes-l-1-bidder-for-nhai-project-in-mp\/","title":{"rendered":"GR Infraprojects becomes L-1 bidder for NHAI project in MP"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/5961?pdf=5961\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\" wp-image-5962 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/03\/GR-Infraprojects-becomes-L-1-bidder-for-NHAI-project-in-MP.jpg\" alt=\"\" width=\"446\" height=\"250\" \/><\/p>\n<p>In the Financial Bid Opening, GR lnfraprojects Limited emerged as the L-1 bidder for the tender called by the National Highways Authority of India for &#8220;4-laning of Ujjain-Badnawar Section from km 26.9 to km 96.00 (length-69.1 km) in the State of Madhya Pradesh on Hybrid Annuity Mode.&#8221;<\/p>\n<p>The bid project costs Rs907 crore, with a completion time of 730 days from the designated date and a 15-year operation duration, according to the business in a filing.<\/p>\n<p>Recognized as the Fastest Growing Construction company in India, <a title=\"GR Infraprojects Limited\" href=\"https:\/\/www.grinfra.com\/contact-us\/\" target=\"_blank\" rel=\"nofollow noopener sponsored\">GR Infraprojects Limited<\/a> (GRIL) has played a pivotal role in the Infrastructure sector, since its inception, in the year 1995.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report In the Financial Bid Opening, GR lnfraprojects Limited emerged as the L-1 bidder for the tender called by the National Highways Authority of India for &#8220;4-laning of Ujjain-Badnawar Section from&#8230; <\/p>\n","protected":false},"author":3,"featured_media":5962,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[2257],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/03\/GR-Infraprojects-becomes-L-1-bidder-for-NHAI-project-in-MP.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/5961"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=5961"}],"version-history":[{"count":2,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/5961\/revisions"}],"predecessor-version":[{"id":5979,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/5961\/revisions\/5979"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/5962"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=5961"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=5961"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=5961"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}