{"id":5776,"date":"2022-03-18T05:09:55","date_gmt":"2022-03-18T05:09:55","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=5776"},"modified":"2023-06-19T06:14:49","modified_gmt":"2023-06-19T06:14:49","slug":"sjvn-gets-100-mw-solar-project-in-gujarat","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/sjvn-gets-100-mw-solar-project-in-gujarat\/","title":{"rendered":"SJVN gets 100-MW solar project in Gujarat"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/5776?pdf=5776\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\" wp-image-2440 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/Mega-Solar-Power-Projects.jpg\" alt=\"\" width=\"479\" height=\"268\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>SJVN, a state-owned power company, announced that it has won a 100 megawatt (MW) grid-connected solar power project in Gujarat through a tariff-based competitive bidding process conducted by Gujarat Urja Vikas Nigam (GUVNL).<\/p>\n<p>According to the official press release, the project will create 245.28 million units of energy each year, with a total energy output of around 6,132 million units during a 25-year period.<\/p>\n<p>GUVNL will acquire the energy generated by this project for 25 years, according to the statement, and a power purchase agreement between SJVN and GUVNL will be finalised soon. The estimated cost of the project is around Rs 500 crore.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report &nbsp; SJVN, a state-owned power company, announced that it has won a 100 megawatt (MW) grid-connected solar power project in Gujarat through a tariff-based competitive bidding process conducted by Gujarat&#8230; <\/p>\n","protected":false},"author":3,"featured_media":2440,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[283],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/Mega-Solar-Power-Projects.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/5776"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=5776"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/5776\/revisions"}],"predecessor-version":[{"id":5777,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/5776\/revisions\/5777"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/2440"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=5776"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=5776"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=5776"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}