{"id":5568,"date":"2022-03-10T06:15:30","date_gmt":"2022-03-10T06:15:30","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=5568"},"modified":"2023-06-19T07:13:56","modified_gmt":"2023-06-19T07:13:56","slug":"j-kumar-infraprojects-bags-major-orders-from-pune-municipal-corporation-of-dmrc","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/j-kumar-infraprojects-bags-major-orders-from-pune-municipal-corporation-of-dmrc\/","title":{"rendered":"J Kumar Infraprojects bags major orders from Pune Municipal Corporation of DMRC"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/5568?pdf=5568\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\" wp-image-5570 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/03\/Metro-Rail--300x169.jpg\" alt=\"\" width=\"437\" height=\"246\" srcset=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/03\/Metro-Rail--300x169.jpg 300w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/03\/Metro-Rail--1024x576.jpg 1024w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/03\/Metro-Rail--768x432.jpg 768w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/03\/Metro-Rail-.jpg 1200w\" sizes=\"(max-width: 437px) 100vw, 437px\" \/><\/p>\n<p>J Kumar Infraprojects Ltd has received the following:<\/p>\n<p>* &#8220;Work Order&#8221; from &#8220;M\/s. Pune Municipal Corporation&#8221; for Development of Mula Mutha River from Bund Garden Bridge to Mundhwa (Stretch 10 and 11) under Pune River Rejuvenation Project and Construction &amp; Development of Riverside Road from Bund Garden Bridge to Mundhwa (Right Hand Side) on Public Private Partnership Module against Development Credit Note awarded amounting to (INR) ~ 604,75,33,736 [Rupees Six Hundred and Four Crores, Seventy-Five Lakhs, Thirty-Three Thousand Seven Hundred and Thirty-Six only)<\/p>\n<p>* &#8220;Letter of Acceptance&#8221; for the execution the &#8220;Contract DC-08: Design and Construction of Twin Tunnel (Up &amp; Down Line) by Shield TBM, Cut and Cover Tunnel box and four Underground stations namely Aerocity, Mahipalpur, Vasant Kunj and Kishangarh with Entry\/Exits &amp; Connecting subways from chainage (-) 760 mt. to 5356.285 mt. of Aerocity to Tughlakabad Corridor of Phase-IV of Delhi MRTS&#8221; worth (INR) ~ 1426,99,50,000 (Rupees One Thousand Four Hundred Twenty-Six Crores Ninety Nine Lakhs Fifty Thousand only) and USD 2,45,00,000 (USD Two Crores Forty Five Lakhs only).<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report J Kumar Infraprojects Ltd has received the following: * &#8220;Work Order&#8221; from &#8220;M\/s. Pune Municipal Corporation&#8221; for Development of Mula Mutha River from Bund Garden Bridge to Mundhwa (Stretch 10&#8230; <\/p>\n","protected":false},"author":4,"featured_media":5570,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[1171],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/03\/Metro-Rail-.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/5568"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=5568"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/5568\/revisions"}],"predecessor-version":[{"id":5571,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/5568\/revisions\/5571"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/5570"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=5568"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=5568"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=5568"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}