{"id":5565,"date":"2022-03-10T06:11:47","date_gmt":"2022-03-10T06:11:47","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=5565"},"modified":"2023-06-19T07:14:35","modified_gmt":"2023-06-19T07:14:35","slug":"lt-construction-gets-new-contract-from-dmrc-for-phase-4-of-delhi-mrts-2","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/lt-construction-gets-new-contract-from-dmrc-for-phase-4-of-delhi-mrts-2\/","title":{"rendered":"L&#038;T Construction gets new contract from DMRC for Phase-4 of Delhi MRTS"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/5565?pdf=5565\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\" wp-image-5566 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/03\/LT-Construction-gets-new-contract-from-DMRC-for-Phase-4-of-Delhi-MRTS.jpg\" alt=\"\" width=\"443\" height=\"259\" \/><\/p>\n<p>The prestigious Delhi Metro Rail Corporation Limited (DMRC) has awarded L&amp;T Construction&#8217;s Heavy Civil Infrastructure business vertical a large contract to design and construct the Underground Metro Project of Phase-IV of the Delhi MRTS.<\/p>\n<p>The project&#8217;s main scope of work includes the design and construction of a 5-kilometer Twin Tunnel (Up and Down Line) by Shield Tunnel Boring Machine (TBM), a Cut and Cover Tunnel box, an Underground Ramp, and four underground stations: Chhattarpur, Chhattarpur Mandir, IGNOU, and Neb Sarai, as well as associated works for the Aerocity to Tughlakabad Corridor of Delhi MRTS Phase IV.<\/p>\n<p>A large portion of the construction is in South Delhi and must be finished in 42 months.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report The prestigious Delhi Metro Rail Corporation Limited (DMRC) has awarded L&amp;T Construction&#8217;s Heavy Civil Infrastructure business vertical a large contract to design and construct the Underground Metro Project of Phase-IV&#8230; <\/p>\n","protected":false},"author":4,"featured_media":5566,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[543],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/03\/LT-Construction-gets-new-contract-from-DMRC-for-Phase-4-of-Delhi-MRTS.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/5565"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=5565"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/5565\/revisions"}],"predecessor-version":[{"id":5567,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/5565\/revisions\/5567"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/5566"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=5565"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=5565"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=5565"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}