{"id":5490,"date":"2022-03-08T06:24:04","date_gmt":"2022-03-08T06:24:04","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=5490"},"modified":"2023-06-19T08:07:24","modified_gmt":"2023-06-19T08:07:24","slug":"hg-infra-subsidiary-gets-financial-closure-for-ham-project","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/hg-infra-subsidiary-gets-financial-closure-for-ham-project\/","title":{"rendered":"HG Infra subsidiary gets financial closure for HAM project"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/5490?pdf=5490\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\" wp-image-5491 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/03\/HG-Infra-subsidiary-gets-financial-closure-for-HAM-project-300x300.jpg\" alt=\"\" width=\"374\" height=\"374\" srcset=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/03\/HG-Infra-subsidiary-gets-financial-closure-for-HAM-project-300x300.jpg 300w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/03\/HG-Infra-subsidiary-gets-financial-closure-for-HAM-project-1024x1024.jpg 1024w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/03\/HG-Infra-subsidiary-gets-financial-closure-for-HAM-project-150x150.jpg 150w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/03\/HG-Infra-subsidiary-gets-financial-closure-for-HAM-project-768x768.jpg 768w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/03\/HG-Infra-subsidiary-gets-financial-closure-for-HAM-project.jpg 1080w\" sizes=\"(max-width: 374px) 100vw, 374px\" \/><\/p>\n<p>HG Raipur Visakhapatnam AP-1 Private Limited, a wholly owned subsidiary of H.G. Infra Engineering Limited (&#8216;HGINFRA&#8217;), has received a letter from the National Highways Authority of India (&#8216;NHAI&#8217;) requesting notation of financial close w.e.f. February 25, 2022 for the project Development of Six Lane Aluru &#8211; Jakkuva Section of NH-130-CD Road from km 365+033 to km 396+800 under Raipur-Visakhapatnam Economics Corridor in the state of Andhra Pradesh on Hybrid Annuity Mode [Package &#8211; 1 (AP)].<\/p>\n<p>Last month, the National Highways Authority of India (NHAI) had issued HG Infra Engineering a letter of award (LoA) for two hybrid annuity method (HAM) projects.<\/p>\n<p>The project entails the construction of a six-lane Kaliagura-Baunsaguar section of NH-130-CD Road in Odisha, from 249.000 km to 293.000 km, as part of the Raipur-Visakhapatnam Economic Corridor (Package OD-5) on a hybrid annuity basis (length 44.000 km). The company&#8217;s bid project costs Rs 1,492.11 crore.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report HG Raipur Visakhapatnam AP-1 Private Limited, a wholly owned subsidiary of H.G. Infra Engineering Limited (&#8216;HGINFRA&#8217;), has received a letter from the National Highways Authority of India (&#8216;NHAI&#8217;) requesting notation&#8230; <\/p>\n","protected":false},"author":3,"featured_media":5491,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[978,2336],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/03\/HG-Infra-subsidiary-gets-financial-closure-for-HAM-project.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/5490"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=5490"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/5490\/revisions"}],"predecessor-version":[{"id":5492,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/5490\/revisions\/5492"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/5491"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=5490"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=5490"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=5490"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}