{"id":5387,"date":"2022-03-01T09:36:12","date_gmt":"2022-03-01T09:36:12","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=5387"},"modified":"2023-06-19T08:38:51","modified_gmt":"2023-06-19T08:38:51","slug":"adani-green-energy-arm-gets-loa-for-250-mw-solar-power-project","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/adani-green-energy-arm-gets-loa-for-250-mw-solar-power-project\/","title":{"rendered":"Adani Green Energy arm gets LOA for 250 MW Solar Power Project"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/5387?pdf=5387\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\" wp-image-5359 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/03\/Adani-Green-Energy-wins-LoA.jpg\" alt=\"\" width=\"434\" height=\"243\" \/><\/p>\n<p>Adani Renewable Energy Holding Fifteen Limited, a wholly-owned subsidiary of Adani Green Energy Limited, took part in a tender issued by Punjab State Power Corporation Limited for the procurement of 250 MW of solar power from ground-mounted grid-connected solar PV power plants and received a Letter of Award (LOA) to build a 150 MW solar power project.<\/p>\n<p>For a period of 25 years, the fixed tariff for this project capacity is Rs. 2.34\/kWh.<\/p>\n<p>AGEL presently has a renewable energy project portfolio with a total capacity of 20.434 MWac, of which 5.410 MWac are operational. There are 11,591 MWac projects in construction, with 3.433 MWac projects nearing completion.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Adani Renewable Energy Holding Fifteen Limited, a wholly-owned subsidiary of Adani Green Energy Limited, took part in a tender issued by Punjab State Power Corporation Limited for the procurement of&#8230; <\/p>\n","protected":false},"author":4,"featured_media":5359,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[393,2354],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/03\/Adani-Green-Energy-wins-LoA.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/5387"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=5387"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/5387\/revisions"}],"predecessor-version":[{"id":5388,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/5387\/revisions\/5388"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/5359"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=5387"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=5387"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=5387"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}