{"id":5313,"date":"2022-03-02T05:54:21","date_gmt":"2022-03-02T05:54:21","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=5313"},"modified":"2023-06-19T08:34:34","modified_gmt":"2023-06-19T08:34:34","slug":"power-grid-corporation-receives-loa-for-transmission-scheme-in-rajasthan","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/power-grid-corporation-receives-loa-for-transmission-scheme-in-rajasthan\/","title":{"rendered":"Power Grid Corporation receives LOA for transmission scheme in Rajasthan"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/5313?pdf=5313\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\" wp-image-3488 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/12\/Adani-Transmission.jpg\" alt=\"\" width=\"444\" height=\"278\" \/><\/p>\n<p>Under Tariff Based Competitive Bidding to Establish Transmission System for &#8220;System Strengthening Transmission Scheme for evacuation of power from solar energy zones in Rajasthan (8.1GW) under Phase-II -Part-G&#8221; on a build, own, operate, and maintain (BOOM) basis, Power Grid Corporation of India Limited has been declared the successful bidder.<\/p>\n<p>&nbsp;<\/p>\n<p>Power Grid Corporation of India Limited has received a Letter of Intent (LoI) dated February 28, 2022.<\/p>\n<p>&nbsp;<\/p>\n<p>The transmission system includes a new 765\/400kV GIS Substation in Narela (NCT of Delhi), as well as 765kV D\/C Transmission Lines in Rajasthan, Haryana, and the NCT of Delhi.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Under Tariff Based Competitive Bidding to Establish Transmission System for &#8220;System Strengthening Transmission Scheme for evacuation of power from solar energy zones in Rajasthan (8.1GW) under Phase-II -Part-G&#8221; on a&#8230; <\/p>\n","protected":false},"author":4,"featured_media":3488,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[636],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/12\/Adani-Transmission.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/5313"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=5313"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/5313\/revisions"}],"predecessor-version":[{"id":5314,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/5313\/revisions\/5314"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/3488"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=5313"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=5313"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=5313"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}