{"id":5237,"date":"2022-02-26T07:21:01","date_gmt":"2022-02-26T07:21:01","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=5237"},"modified":"2023-06-19T08:51:49","modified_gmt":"2023-06-19T08:51:49","slug":"pnc-infratech-gets-a-new-hybrid-annuity-highway-project-of-rs-885-crore","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/pnc-infratech-gets-a-new-hybrid-annuity-highway-project-of-rs-885-crore\/","title":{"rendered":"PNC infratech gets a new hybrid annuity highway project of Rs 885 crore"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/5237?pdf=5237\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\" wp-image-5238 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/02\/highway-1200-sixteen_nine-300x169.jpg\" alt=\"\" width=\"460\" height=\"259\" srcset=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/02\/highway-1200-sixteen_nine-300x169.jpg 300w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/02\/highway-1200-sixteen_nine-1024x576.jpg 1024w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/02\/highway-1200-sixteen_nine-768x432.jpg 768w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/02\/highway-1200-sixteen_nine.jpg 1200w\" sizes=\"(max-width: 460px) 100vw, 460px\" \/><\/p>\n<p><a title=\"PNC Infratech Limited\" href=\"https:\/\/www.pncinfratech.com\/\" target=\"_blank\" rel=\"nofollow noopener\">PNC Infratech Limited<\/a> has been declared the L1 (lowest) bidder for an NHAI project to four-lane the Mathura Bypass to Gaju Village stretch of NH 530B in the state of Uttar Pradesh, with a Bid Project Cost of Rs. 885.0 crore.<\/p>\n<p>On Friday, February 25, 2022, the price bids were opened, with PNC&#8217;s bid being the lowest (L1).<\/p>\n<p>The project will be built in 24 months and will be operational for 15 years after that.<\/p>\n<p><a title=\"PNC Infratech Limited\" href=\"https:\/\/www.pncinfratech.com\/\" target=\"_blank\" rel=\"nofollow noopener\">PNC Infratech Limited<\/a> (PNCIL) and its subsidiaries is engaged in India&#8217;s infrastructure development through the construction of highways including BOT (built, operate and transfer projects), airport runways, bridges, flyovers and power transmission projects among others.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report PNC Infratech Limited has been declared the L1 (lowest) bidder for an NHAI project to four-lane the Mathura Bypass to Gaju Village stretch of NH 530B in the state of&#8230; <\/p>\n","protected":false},"author":4,"featured_media":5238,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[1726],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/02\/highway-1200-sixteen_nine.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/5237"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=5237"}],"version-history":[{"count":2,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/5237\/revisions"}],"predecessor-version":[{"id":7794,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/5237\/revisions\/7794"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/5238"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=5237"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=5237"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=5237"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}