{"id":4913,"date":"2022-02-14T06:31:43","date_gmt":"2022-02-14T06:31:43","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=4913"},"modified":"2022-02-15T06:32:54","modified_gmt":"2022-02-15T06:32:54","slug":"four-bidders-for-amas-darbhanga-expressways-work","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/four-bidders-for-amas-darbhanga-expressways-work\/","title":{"rendered":"Four bidders for Amas-Darbhanga Expressway&#8217;s work"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/4913?pdf=4913\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\"alignnone  wp-image-4914 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/02\/Four-bidders-for-Amas-Darbhanga.jpg\" alt=\"\" width=\"409\" height=\"301\" \/><\/p>\n<p>A total of 7 offers from four construction firms were received for the construction of the 55.002 km Package-1 and 54.322 km Package-2 of the 230 km Amas \u2013 Darbhanga Expressway (NH-119D).<\/p>\n<p>This four-lane access-controlled roadway, built by the National Highways Authority of India (NHAI), would be Bihar&#8217;s first expressway. It will travel north-south to connect the fringes of Aurangabad, Gaya, Patna, and Darbhanga, and will employ portions of the Patna Outer Ring Road and the 9.75-kilometer Kachchi Dargah \u2013 Bidupur Bridge projects that are now under development.<\/p>\n<p>Package 1 would run from Amas (NH-02 km 0.0) to Shivrampur (NH-02 km 55.002), while Package 2 will go from Shivrampur to Ramnagar (NH-02 km 109.324) in South Bihar.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report A total of 7 offers from four construction firms were received for the construction of the 55.002 km Package-1 and 54.322 km Package-2 of the 230 km Amas \u2013 Darbhanga&#8230; <\/p>\n","protected":false},"author":4,"featured_media":4914,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/02\/Four-bidders-for-Amas-Darbhanga.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/4913"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=4913"}],"version-history":[{"count":3,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/4913\/revisions"}],"predecessor-version":[{"id":7702,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/4913\/revisions\/7702"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/4914"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=4913"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=4913"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=4913"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}