{"id":4745,"date":"2022-02-08T05:08:18","date_gmt":"2022-02-08T05:08:18","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=4745"},"modified":"2023-06-19T10:35:46","modified_gmt":"2023-06-19T10:35:46","slug":"ntpc-commences-operation-of-74-8-mw-solar-capacity-in-rajasthan","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/ntpc-commences-operation-of-74-8-mw-solar-capacity-in-rajasthan\/","title":{"rendered":"NTPC commences operation of 74.8 MW solar capacity in Rajasthan"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/4745?pdf=4745\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\"alignnone wp-image-2865 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/Gautam-Solar-300x158.jpg\" alt=\"\" width=\"467\" height=\"246\" srcset=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/Gautam-Solar-300x158.jpg 300w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/Gautam-Solar.jpg 310w\" sizes=\"(max-width: 467px) 100vw, 467px\" \/><\/p>\n<p>The Fatehgarh Solar PV Project in Jaisalmer, Rajasthan, has 74.88 MW of commercially operational electricity generation capacity, according to state-run power company NTPC.<\/p>\n<p>&#8220;The second portion capacity of 74.88 MW out of 296 MW Fatehgarh Solar PV Project in Jaisalmer, Rajasthan, is declared on Commercial Operation from 00:00 Hrs. on February 5, 2022,&#8221; according to a BSE filing.<\/p>\n<p>With this, the NTPC and NTPC group&#8217;s commercial capacity has increased to 54,377.30 MW and 67,832.30 MW, respectively.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report The Fatehgarh Solar PV Project in Jaisalmer, Rajasthan, has 74.88 MW of commercially operational electricity generation capacity, according to state-run power company NTPC. &#8220;The second portion capacity of 74.88 MW&#8230; <\/p>\n","protected":false},"author":4,"featured_media":2865,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/Gautam-Solar.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/4745"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=4745"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/4745\/revisions"}],"predecessor-version":[{"id":4746,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/4745\/revisions\/4746"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/2865"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=4745"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=4745"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=4745"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}