{"id":4554,"date":"2022-01-31T10:38:24","date_gmt":"2022-01-31T10:38:24","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=4554"},"modified":"2023-06-19T11:04:26","modified_gmt":"2023-06-19T11:04:26","slug":"ntpc-rel-floats-tender-for-setting-up-3000-mwh-re-storage-facility","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/ntpc-rel-floats-tender-for-setting-up-3000-mwh-re-storage-facility\/","title":{"rendered":"NTPC REL floats tender for setting up 3,000 MWh RE storage facility"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/4554?pdf=4554\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\"alignnone wp-image-4555 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/02\/IMG_IMG_02RJY5NTPC_SIMHA_2_1_I29DG3JM-267x300.jpg\" alt=\"\" width=\"351\" height=\"393\" \/><\/p>\n<p>NTPC Renewable Energy (NTPC REL), a subsidiary of NTPC, has issued a request for proposals for the construction of a 3,000 MWh inter-state transmission system (ISTS)-connected energy storage facility in India.<\/p>\n<p>&nbsp;<\/p>\n<p>NTPC REL plans to use an ISTS-connected energy storage solution with a capacity of 3,000 MWh and a 500 MW (minimum) capacity at any location in India to satisfy its RE RTC (Round the Clock) complementing wind and solar generation profile under the service model.<\/p>\n<p>&nbsp;<\/p>\n<p>The project will have a minimum capacity of 100 MW and a minimum capacity of 600 MWh. The energy generated by the renewable energy projects will be used to charge the ESS plant.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report NTPC Renewable Energy (NTPC REL), a subsidiary of NTPC, has issued a request for proposals for the construction of a 3,000 MWh inter-state transmission system (ISTS)-connected energy storage facility in&#8230; <\/p>\n","protected":false},"author":1,"featured_media":4555,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[1],"tags":[1753],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/02\/IMG_IMG_02RJY5NTPC_SIMHA_2_1_I29DG3JM.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/4554"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=4554"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/4554\/revisions"}],"predecessor-version":[{"id":4556,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/4554\/revisions\/4556"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/4555"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=4554"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=4554"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=4554"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}