{"id":453,"date":"2021-09-28T06:14:55","date_gmt":"2021-09-28T06:14:55","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=453"},"modified":"2021-09-28T06:14:55","modified_gmt":"2021-09-28T06:14:55","slug":"line-2-commercial-production-at-kapilas-cement-manufacturing-works-begins","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/line-2-commercial-production-at-kapilas-cement-manufacturing-works-begins\/","title":{"rendered":"Line 2 commercial production at Kapilas Cement Manufacturing Works begins"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/453?pdf=453\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/09\/Dalmia-Cement.jpg\" alt=\"Dalmia Cement\" \/>&nbsp;<\/p>\n<p>Dalmia Cement (Bharat) Limited has announced the start of commercial production of Line 2, with a capacity of 2.25 million tonnes, at its Kapilas Cement Manufacturing Works (KCMW) Unit in Cuttack, Odisha.<\/p>\n<p>The company&#8217;s total capacity at the facility has now increased to 3.95 million tonnes per year as a result of this expansion.<\/p>\n<p>Dalmia Cement (Bharath) Limited MD and CEO Mahendra Singhi said, \u201cWe are happy to announce that DCBL has commenced commercial production of Line 2 at our KCW plant. With this, we are a step closer to our goal of taking our capacity from 30.75 million tonnes to 48.5 million tonnes by FY24.&#8221;<\/p>\n<p>Image Credit : <em>prameyanews.com<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report &nbsp; Dalmia Cement (Bharat) Limited has announced the start of commercial production of Line 2, with a capacity of 2.25 million tonnes, at its Kapilas Cement Manufacturing Works (KCMW) Unit&#8230; <\/p>\n","protected":false},"author":1,"featured_media":454,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/09\/Dalmia-Cement.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/453"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=453"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/453\/revisions"}],"predecessor-version":[{"id":455,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/453\/revisions\/455"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/454"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=453"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=453"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=453"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}