{"id":4524,"date":"2022-01-28T10:10:33","date_gmt":"2022-01-28T10:10:33","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=4524"},"modified":"2022-01-29T10:12:22","modified_gmt":"2022-01-29T10:12:22","slug":"nhai-declares-hg-infra-engineering-as-l1-bidder-for-epc-project","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/nhai-declares-hg-infra-engineering-as-l1-bidder-for-epc-project\/","title":{"rendered":"NHAI declares HG Infra Engineering as L1 bidder for EPC project"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/4524?pdf=4524\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\"alignnone  wp-image-4525 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/01\/NHAI-declares-300x225.jpg\" alt=\"\" width=\"439\" height=\"329\" srcset=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/01\/NHAI-declares-300x225.jpg 300w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/01\/NHAI-declares.jpg 448w\" sizes=\"(max-width: 439px) 100vw, 439px\" \/><\/p>\n<p>The National Highways Authority of India has declared H G Infra Engineering as the lowest (L-1) bidder (NHAI).<\/p>\n<p>&nbsp;<\/p>\n<p>Under the Bharatmala Pariyojna, the scope of work includes six-laning with access control from 29.435 km to 74.168 km of NH-48 (formerly NH-4) in the state of Karnataka, including the Tumkur bypass section. The total length of the road is 44.733 kilometres.<\/p>\n<p>The estimated project cost is Rs 844.11 crore, with a three-year completion period.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report The National Highways Authority of India has declared H G Infra Engineering as the lowest (L-1) bidder (NHAI). &nbsp; Under the Bharatmala Pariyojna, the scope of work includes six-laning with&#8230; <\/p>\n","protected":false},"author":1,"featured_media":4525,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[1],"tags":[],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/01\/NHAI-declares.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/4524"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=4524"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/4524\/revisions"}],"predecessor-version":[{"id":4526,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/4524\/revisions\/4526"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/4525"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=4524"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=4524"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=4524"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}