{"id":4346,"date":"2022-01-21T08:45:50","date_gmt":"2022-01-21T08:45:50","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=4346"},"modified":"2022-01-22T08:48:48","modified_gmt":"2022-01-22T08:48:48","slug":"work-for-first-phase-if-hassan-airport-begins","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/work-for-first-phase-if-hassan-airport-begins\/","title":{"rendered":"Work for first phase if Hassan airport begins"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/4346?pdf=4346\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\"alignnone  wp-image-4347 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/01\/hassan_airport_banner-300x225.jpg\" alt=\"\" width=\"433\" height=\"326\" srcset=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/01\/hassan_airport_banner-300x225.jpg 300w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/01\/hassan_airport_banner-768x576.jpg 768w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/01\/hassan_airport_banner.jpg 1024w\" sizes=\"(max-width: 433px) 100vw, 433px\" \/><\/p>\n<p>The first phase of the Hassan Airport in Karnataka, which would cost Rs 100 crore, has begun construction.<\/p>\n<p>Work on a 536-acre plot of land has begun, including the construction of a 2.8-kilometer-long, 300-meter-wide runway.<\/p>\n<p>The development of a passenger terminal building and an air traffic control room is part of Phase II. The project&#8217;s overall cost is Rs 193 crore.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report The first phase of the Hassan Airport in Karnataka, which would cost Rs 100 crore, has begun construction. Work on a 536-acre plot of land has begun, including the construction&#8230; <\/p>\n","protected":false},"author":1,"featured_media":4347,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/01\/hassan_airport_banner.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/4346"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=4346"}],"version-history":[{"count":2,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/4346\/revisions"}],"predecessor-version":[{"id":7485,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/4346\/revisions\/7485"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/4347"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=4346"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=4346"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=4346"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}