{"id":3422,"date":"2021-12-17T06:28:20","date_gmt":"2021-12-17T06:28:20","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=3422"},"modified":"2021-12-18T06:29:53","modified_gmt":"2021-12-18T06:29:53","slug":"fgd-system-installation-underway-for-nearly-60gw-capacity-of-ntpc","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/fgd-system-installation-underway-for-nearly-60gw-capacity-of-ntpc\/","title":{"rendered":"FGD system installation underway for nearly 60GW capacity of NTPC"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/3422?pdf=3422\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\"alignnone  wp-image-3423 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/12\/system-installation-underway1-300x130.jpg\" alt=\"\" width=\"452\" height=\"196\" srcset=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/12\/system-installation-underway1-300x130.jpg 300w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/12\/system-installation-underway1.jpg 341w\" sizes=\"(max-width: 452px) 100vw, 452px\" \/><\/p>\n<p>Parliament was informed that a flue gas desulphurisation (FGD) technology to manage pollution has been installed for NTPC NSE -1.57 percent&#8217;s 1340 MW coal-fired thermal power capacity, while work is underway at 38 facilities with a combined capacity of roughly 60GW.<\/p>\n<p>In a written reply to the Lok Sabha, Power Minister R K Singh stated that NTPC&#8217;s total FGD commissioned capacity is 1,340 MW.<\/p>\n<p>According to him, FGD systems are being installed in NTPC&#8217;s 38 facilities (127 units) across the country, totaling 60GW of thermal power overall capacity.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Parliament was informed that a flue gas desulphurisation (FGD) technology to manage pollution has been installed for NTPC NSE -1.57 percent&#8217;s 1340 MW coal-fired thermal power capacity, while work is&#8230; <\/p>\n","protected":false},"author":1,"featured_media":3423,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[1],"tags":[],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/12\/system-installation-underway1.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/3422"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=3422"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/3422\/revisions"}],"predecessor-version":[{"id":3424,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/3422\/revisions\/3424"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/3423"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=3422"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=3422"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=3422"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}