{"id":2403,"date":"2021-11-12T07:30:20","date_gmt":"2021-11-12T07:30:20","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=2403"},"modified":"2021-11-13T07:31:37","modified_gmt":"2021-11-13T07:31:37","slug":"j-kumar-infraprojects-ltd-receives-loa-for-navi-mumbai-metro-project","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/j-kumar-infraprojects-ltd-receives-loa-for-navi-mumbai-metro-project\/","title":{"rendered":"J Kumar Infraprojects Ltd receives LOA for Navi Mumbai Metro project"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/2403?pdf=2403\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\"alignnone  wp-image-2404 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/metro-project-300x125.jpg\" alt=\"\" width=\"495\" height=\"208\" srcset=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/metro-project-300x125.jpg 300w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/metro-project.jpg 348w\" sizes=\"(max-width: 495px) 100vw, 495px\" \/><\/p>\n<p>Maharashtra Metro Rail Corporation Limited (Navi Mumbai Metro Rail Project) has issued a Letter of Acceptance to J. Kumar Infraprojects Ltd for the following work:<\/p>\n<p>&nbsp;<\/p>\n<p>Design (part) and construction of balance works for Navi Mumbai Metro Line-1 at Kharghar Village, Kendriya Vihar, Utsav Chowk, Belpada, RBI Colony, and Belapur Terminal Station, totaling Rs. 168,22,02,591.25 (on behalf of CIDCO) (Rupees One Hundred Sixty-Eight Crores Twenty-Two Lakhs Two Thousand Five Hundred Ninety-One and Paise TwentyFive Only).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Maharashtra Metro Rail Corporation Limited (Navi Mumbai Metro Rail Project) has issued a Letter of Acceptance to J. Kumar Infraprojects Ltd for the following work: &nbsp; Design (part) and construction&#8230; <\/p>\n","protected":false},"author":1,"featured_media":2404,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/metro-project.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/2403"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=2403"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/2403\/revisions"}],"predecessor-version":[{"id":2405,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/2403\/revisions\/2405"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/2404"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=2403"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=2403"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=2403"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}