{"id":2391,"date":"2021-11-11T05:38:05","date_gmt":"2021-11-11T05:38:05","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=2391"},"modified":"2021-11-13T05:39:28","modified_gmt":"2021-11-13T05:39:28","slug":"ircon-emerges-lowest-bidder-for-mumbai-ahmedabad-high-speed-rail-track-works","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/ircon-emerges-lowest-bidder-for-mumbai-ahmedabad-high-speed-rail-track-works\/","title":{"rendered":"Ircon emerges lowest bidder for Mumbai-Ahmedabad High-Speed rail track works"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/2391?pdf=2391\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\"alignnone  wp-image-2392 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/workers-on-railway-lines-300x142.jpg\" alt=\"\" width=\"431\" height=\"204\" srcset=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/workers-on-railway-lines-300x142.jpg 300w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/workers-on-railway-lines.jpg 646w\" sizes=\"(max-width: 431px) 100vw, 431px\" \/><\/p>\n<p>Ircon International was the lowest (L1) bidder in the National High Speed Rail Corporation&#8217;s tender for a project worth Rs 5,142 crore (NHSRCL).<\/p>\n<p>For the construction of the Mumbai-Ahmedabad High-Speed Rail, the scope of work includes design, supply, and construction of track and track-related works, including testing and commissioning, for a double line high-speed railway between Zaroli village on the Maharashtra Gujarat Border (MAHSR 156.600 km) and Vadodara (MAHSR 393.700 km) in Gujarat and the Union Territory of Dadra and Nagar Haveli.<\/p>\n<p>The project will take roughly 6.5 years to complete. NHSRCL is yet to release the letter of award (LoA).<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Ircon International was the lowest (L1) bidder in the National High Speed Rail Corporation&#8217;s tender for a project worth Rs 5,142 crore (NHSRCL). For the construction of the Mumbai-Ahmedabad High-Speed&#8230; <\/p>\n","protected":false},"author":1,"featured_media":2392,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/workers-on-railway-lines.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/2391"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=2391"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/2391\/revisions"}],"predecessor-version":[{"id":2393,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/2391\/revisions\/2393"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/2392"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=2391"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=2391"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=2391"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}