{"id":2384,"date":"2021-11-11T05:28:57","date_gmt":"2021-11-11T05:28:57","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=2384"},"modified":"2021-11-13T05:32:12","modified_gmt":"2021-11-13T05:32:12","slug":"nhai-gives-appointed-date-for-gandeva-ena-ham-project","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/nhai-gives-appointed-date-for-gandeva-ena-ham-project\/","title":{"rendered":"NHAI gives appointed date for Gandeva-Ena Ham project"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/2384?pdf=2384\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\"alignnone  wp-image-2385 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/infrastructure-highway-300x169.jpg\" alt=\"\" width=\"440\" height=\"248\" srcset=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/infrastructure-highway-300x169.jpg 300w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/infrastructure-highway-768x432.jpg 768w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/infrastructure-highway.jpg 925w\" sizes=\"(max-width: 440px) 100vw, 440px\" \/><\/p>\n<p>NHAI has given VM-7 Expressway Private Ltd., a wholly-owned subsidiary and Special Purpose Vehicle (SPV) of IRB Infrastructure Developers Ltd, an Appointed Date of November 09, 2021, for its 27.500-kilometer Gandeva \u2013 Ena Hybrid Annuity project, which is part of the upcoming Vadodara \u2013 Mumbai Expressway.<\/p>\n<p>As a result, the SPV is on track to begin building on the project soon.<\/p>\n<p>\u201cThis is encouraging for us, as we can commence construction for the project. Getting an appointed date is a step forward to meet deadlines with quality construction and ensuring revenue flows as envisaged. We are confident of timely completion of the project with world class quality and high safety standards to ensure a safe and comfortable travel experience for commuters,\u201d IRB Infrastructure Developers LTD spokesperson said.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report NHAI has given VM-7 Expressway Private Ltd., a wholly-owned subsidiary and Special Purpose Vehicle (SPV) of IRB Infrastructure Developers Ltd, an Appointed Date of November 09, 2021, for its 27.500-kilometer&#8230; <\/p>\n","protected":false},"author":1,"featured_media":2385,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/infrastructure-highway.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/2384"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=2384"}],"version-history":[{"count":2,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/2384\/revisions"}],"predecessor-version":[{"id":2387,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/2384\/revisions\/2387"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/2385"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=2384"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=2384"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=2384"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}