{"id":236,"date":"2021-09-21T04:54:55","date_gmt":"2021-09-21T04:54:55","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=236"},"modified":"2021-09-21T04:56:11","modified_gmt":"2021-09-21T04:56:11","slug":"new-projects-by-dakshayani-chemicals-keshari-unipolypro-nu-vista-udaipur-cement-works-and-more","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/new-projects-by-dakshayani-chemicals-keshari-unipolypro-nu-vista-udaipur-cement-works-and-more\/","title":{"rendered":"New Projects by Dakshayani Chemicals, Keshari Unipolypro, NU Vista, Udaipur Cement Works and more\u2026"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/236?pdf=236\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<h5>NU Vista&#8217;s Greenfield Cement Plant<\/h5>\n<p>NU Vista is planning to take up Greenfield cement plant in Tangeda, Taluka: Dachepalli, Guntur, Andhra Pradesh. The project involves setting up cement plant will be capable of producing about 3.20 MTPA of clinker and 4.25 MTPA of cement along with install a 30 MW captive coal based thermal power plant &amp; 15 MW waste heat recovery power plant and 100 TPH synthetic gypsum plant. The estimated cost of the project is Rs.19500 million. As of September 2021, environment clearance for the project is underway.<\/p>\n<h5>Gloster&#8217;s New Integrated Jute Mill<\/h5>\n<p>Gloster is planning to take up new integrated jute mill in Warangal, Telangana . The project involves set up an integrated jute mill. The estimated cost of the project is Rs.3300 million. As of September 2021, Gloster Limited has signed Memorandum of Understanding with the Government of Telangana.<\/p>\n<p><strong>To access all new projects covered today, download the report<\/strong><\/p>\n<p><img class=\"alignnone wp-image-237\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/09\/photo_2021-09-21_10-23-40-232x300.jpg\" alt=\"\" width=\"821\" height=\"1062\" srcset=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/09\/photo_2021-09-21_10-23-40-232x300.jpg 232w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/09\/photo_2021-09-21_10-23-40-791x1024.jpg 791w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/09\/photo_2021-09-21_10-23-40-768x994.jpg 768w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/09\/photo_2021-09-21_10-23-40.jpg 989w\" sizes=\"(max-width: 821px) 100vw, 821px\" \/><\/p>\n<p><strong><a href=\"https:\/\/www.newprojectstracker.com\/online\">Download Daily Projects Report \u2013 Issue No : 088<\/a><\/strong><\/p>\n<p>The Daily Project Report compiled from new projects updated on the previous day is sent to all paid subscribers and has 15 New Projects in Energy, Infrastructure, Chemicals, Textiles, Paper, Cement, Steel, Water Treatment and other Manufacturing Projects in India<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report NU Vista&#8217;s Greenfield Cement Plant NU Vista is planning to take up Greenfield cement plant in Tangeda, Taluka: Dachepalli, Guntur, Andhra Pradesh. The project involves setting up cement plant will&#8230; <\/p>\n","protected":false},"author":1,"featured_media":237,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[10],"tags":[],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/09\/photo_2021-09-21_10-23-40.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/236"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=236"}],"version-history":[{"count":2,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/236\/revisions"}],"predecessor-version":[{"id":292,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/236\/revisions\/292"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/237"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=236"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=236"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=236"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}