{"id":2347,"date":"2021-11-10T10:47:14","date_gmt":"2021-11-10T10:47:14","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=2347"},"modified":"2021-11-12T10:58:58","modified_gmt":"2021-11-12T10:58:58","slug":"nhpc-invites-tender-for-dugar-he-project","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/nhpc-invites-tender-for-dugar-he-project\/","title":{"rendered":"NHPC invites tender for Dugar HE Project"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/2347?pdf=2347\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\"alignnone  wp-image-2348 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/Dugar-HE-Project-300x154.jpg\" alt=\"\" width=\"464\" height=\"238\" srcset=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/Dugar-HE-Project-300x154.jpg 300w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/Dugar-HE-Project.jpg 313w\" sizes=\"(max-width: 464px) 100vw, 464px\" \/><\/p>\n<p>NHPC has invited tender for Dugar hydro electric (HE) project in Chamba district of Himachal Pradesh.<br \/>\nThe scope of work includes construction of civil works of diversion tunnels, dam &amp; spillway, main and auxiliary Intakes, pressure tunnel\/shaft (main &amp; auxiliary), underground power house, draft tube tunnels, downstream surge chamber, pothead yard, tail race tunnels for main and auxiliary plant including planning, investigation, design, construction &amp; testing of permanent bridge downstream of the dam connecting MAT and RB (right bank), other associated adits\/structures, etc for Dugar HE Project.<br \/>\nThe cost of the project is Rs 1,534.67 crore with a completion period of 73 months.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report NHPC has invited tender for Dugar hydro electric (HE) project in Chamba district of Himachal Pradesh. The scope of work includes construction of civil works of diversion tunnels, dam &amp;&#8230; <\/p>\n","protected":false},"author":1,"featured_media":2348,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/Dugar-HE-Project.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/2347"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=2347"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/2347\/revisions"}],"predecessor-version":[{"id":2349,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/2347\/revisions\/2349"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/2348"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=2347"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=2347"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=2347"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}