{"id":2340,"date":"2021-11-10T10:39:01","date_gmt":"2021-11-10T10:39:01","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=2340"},"modified":"2021-11-12T10:40:48","modified_gmt":"2021-11-12T10:40:48","slug":"ircon-international-floats-tender-for-railway-bridge-on-river-ganga","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/ircon-international-floats-tender-for-railway-bridge-on-river-ganga\/","title":{"rendered":"Ircon International floats tender for railway bridge on river Ganga"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/2340?pdf=2340\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\"alignnone  wp-image-2341 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/river-bridger-in-Ganga.jpg\" alt=\"\" width=\"417\" height=\"250\" \/><\/p>\n<p>Ircon International has issued a request for proposals for the construction of a railway bridge across the Ganga in Bihar.<br \/>\nOn the south end approach of the proposed railway bridge on the Ganga at Mokama from Hathidah-Rampur Dumra line for single track and Hathidah-Tal line for single track in connection with RampurdumraTal-Rajendrapul additional bridge and doubling project in Danapur division of the East Central Railway in Bihar, the scope of work includes construction of rail viaducts on pile foundation with composite steel girders and deck slabs.<br \/>\nThe project&#8217;s anticipated cost is Rs 308.65 crore, with a 15-month completion time.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Ircon International has issued a request for proposals for the construction of a railway bridge across the Ganga in Bihar. On the south end approach of the proposed railway bridge&#8230; <\/p>\n","protected":false},"author":1,"featured_media":2341,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/river-bridger-in-Ganga.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/2340"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=2340"}],"version-history":[{"count":2,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/2340\/revisions"}],"predecessor-version":[{"id":2343,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/2340\/revisions\/2343"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/2341"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=2340"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=2340"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=2340"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}