{"id":2334,"date":"2021-11-10T10:32:21","date_gmt":"2021-11-10T10:32:21","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=2334"},"modified":"2021-11-12T10:34:29","modified_gmt":"2021-11-12T10:34:29","slug":"nmc-plans-to-complete-metro-mall-in-30-months","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/nmc-plans-to-complete-metro-mall-in-30-months\/","title":{"rendered":"NMC plans to complete Metro Mall in 30 months"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/2334?pdf=2334\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\"alignnone  wp-image-2335 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/metro-mall.jpg\" alt=\"\" width=\"416\" height=\"265\" \/><\/p>\n<p>The Nagpur Municipal Corporation (NMC) expects the Metro Mall construction to be finished in 30 months after a two-year delay.<br \/>\nThe project department of the NMC has submitted a proposal to the standing committee.<\/p>\n<p>The NMC recently shortlisted a private agency that promised to pay Rs10 crore more than the Rs45 crore bid price.<br \/>\nThe NMC had issued tenders for the construction of an eight-story building featuring a shopping mall, restaurant, and multiplex with a rooftop caf\u00e9.<br \/>\nThe mall, which is part of the Orange City Street project&#8217;s first phase, will be a public-private partnership.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report The Nagpur Municipal Corporation (NMC) expects the Metro Mall construction to be finished in 30 months after a two-year delay. The project department of the NMC has submitted a proposal&#8230; <\/p>\n","protected":false},"author":1,"featured_media":2335,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/metro-mall.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/2334"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=2334"}],"version-history":[{"count":2,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/2334\/revisions"}],"predecessor-version":[{"id":2337,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/2334\/revisions\/2337"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/2335"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=2334"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=2334"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=2334"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}