{"id":2295,"date":"2021-11-09T07:07:30","date_gmt":"2021-11-09T07:07:30","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=2295"},"modified":"2021-11-12T07:09:03","modified_gmt":"2021-11-12T07:09:03","slug":"sjvn-receives-100-mw-grid-connected-solar-pv-power-project-2","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/sjvn-receives-100-mw-grid-connected-solar-pv-power-project-2\/","title":{"rendered":"SJVN receives 100 MW grid connected solar PV power project"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/2295?pdf=2295\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\" wp-image-1014 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/power-solar-plant-in-karnataka-300x194.jpg\" alt=\"\" width=\"416\" height=\"269\" srcset=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/power-solar-plant-in-karnataka-300x194.jpg 300w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/power-solar-plant-in-karnataka.jpg 620w\" sizes=\"(max-width: 416px) 100vw, 416px\" \/><\/p>\n<p>SJVN has won a 100 MW grid-connected solar PV power project from the Punjab State Power Corporation (PSPCL) through a tariff-based competitive bidding process. The project will be built, owned, and operated (BOO) at a cost of Rs 2.69 per unit.<\/p>\n<p>This project&#8217;s estimated construction cost is Rs 545 crore.<\/p>\n<p>The project is predicted to generate 245.28 MU in the first year, with a total energy generation of roughly 5,643.52 MU during a 25-year timeframe.<\/p>\n<p>The power purchase agreement (PPA) between PSPCL and SJVN will be inked for a period of 25 years.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report SJVN has won a 100 MW grid-connected solar PV power project from the Punjab State Power Corporation (PSPCL) through a tariff-based competitive bidding process. The project will be built, owned,&#8230; <\/p>\n","protected":false},"author":1,"featured_media":1014,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/power-solar-plant-in-karnataka.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/2295"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=2295"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/2295\/revisions"}],"predecessor-version":[{"id":2296,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/2295\/revisions\/2296"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/1014"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=2295"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=2295"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=2295"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}