{"id":2221,"date":"2021-11-08T06:31:19","date_gmt":"2021-11-08T06:31:19","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=2221"},"modified":"2021-11-09T06:39:30","modified_gmt":"2021-11-09T06:39:30","slug":"ntpc-commissions-unit-1-of-660-mw-of-barh-super-thermal-power-project","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/ntpc-commissions-unit-1-of-660-mw-of-barh-super-thermal-power-project\/","title":{"rendered":"NTPC commissions Unit-1 of 660 MW of Barh Super Thermal Power project"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/2221?pdf=2221\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\"alignnone  wp-image-2222 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/thermal-power-project.jpg\" alt=\"\" width=\"344\" height=\"344\" srcset=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/thermal-power-project.jpg 225w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/thermal-power-project-150x150.jpg 150w\" sizes=\"(max-width: 344px) 100vw, 344px\" \/><\/p>\n<p>NTPC Ltd has informed the exchanges that the 660 MW capacity unit of the Barh Super Thermal Power Project has completed its trial operation.<\/p>\n<p>&#8220;In line with the Corporate Disclosure requirements, it is informed that Unit-1 of 660 MW capacity of Barh Super Thermal Power Project-Stage-I, (3 x 660 MW) has successfully completed trial operation and has consequently been included in the installed capacity of NTPC Limited,&#8221; the company said in a regulatory filing.<\/p>\n<p>With this, NTPC Limited and the NTPC Group&#8217;s total installed capacity has increased to 54232.5 MW and 67657.5 MW, respectively.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report NTPC Ltd has informed the exchanges that the 660 MW capacity unit of the Barh Super Thermal Power Project has completed its trial operation. &#8220;In line with the Corporate Disclosure&#8230; <\/p>\n","protected":false},"author":1,"featured_media":2222,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/thermal-power-project.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/2221"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=2221"}],"version-history":[{"count":2,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/2221\/revisions"}],"predecessor-version":[{"id":2224,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/2221\/revisions\/2224"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/2222"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=2221"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=2221"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=2221"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}