{"id":2164,"date":"2021-11-02T06:49:14","date_gmt":"2021-11-02T06:49:14","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=2164"},"modified":"2021-11-03T06:50:54","modified_gmt":"2021-11-03T06:50:54","slug":"jsw-steel-starts-baytown-plate-mill-facility-upgradation","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/jsw-steel-starts-baytown-plate-mill-facility-upgradation\/","title":{"rendered":"JSW Steel starts Baytown plate mill facility upgradation"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/2164?pdf=2164\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\"alignnone  wp-image-1107 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/steel-300x166.jpg\" alt=\"\" width=\"448\" height=\"248\" srcset=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/steel-300x167.jpg 300w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/steel.jpg 302w\" sizes=\"(max-width: 448px) 100vw, 448px\" \/><\/p>\n<p>JSW Steel (USA) Inc, a subsidiary of JSW Steel, has begun work on modernising its Plate Mill in Baytown&#8217;s second phase. It is expected to be finished in the second half of 2023.<\/p>\n<p>A 4-hi finishing mill, pre-leveler, accelerated cooling system\/direct quench, cooling beds, and a new roll shop are all part of the project.<\/p>\n<p>The project, according to Parth Jindal, Director, JSW USA, is part of a $260 million investment by JSW to increase product quality, productivity, yields, and overall cost-effectiveness at the Baytown plate plant.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report JSW Steel (USA) Inc, a subsidiary of JSW Steel, has begun work on modernising its Plate Mill in Baytown&#8217;s second phase. It is expected to be finished in the second&#8230; <\/p>\n","protected":false},"author":1,"featured_media":1107,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/steel.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/2164"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=2164"}],"version-history":[{"count":2,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/2164\/revisions"}],"predecessor-version":[{"id":2166,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/2164\/revisions\/2166"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/1107"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=2164"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=2164"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=2164"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}