{"id":2126,"date":"2021-11-01T07:43:28","date_gmt":"2021-11-01T07:43:28","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=2126"},"modified":"2021-11-02T07:45:14","modified_gmt":"2021-11-02T07:45:14","slug":"dhi-invites-bidders-for-pli-scheme-on-acc-battery-storage","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/dhi-invites-bidders-for-pli-scheme-on-acc-battery-storage\/","title":{"rendered":"DHI invites bidders for PLI scheme on ACC battery storage"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/2126?pdf=2126\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\" wp-image-2127 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/battery-300x169.jpg\" alt=\"\" width=\"460\" height=\"259\" srcset=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/battery-300x169.jpg 300w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/battery-1024x576.jpg 1024w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/battery-768x432.jpg 768w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/battery-1536x864.jpg 1536w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/battery.jpg 1920w\" sizes=\"(max-width: 460px) 100vw, 460px\" \/><\/p>\n<p>The Ministry of Heavy Industries (MHI) has issued a Request for Proposal (RFP) to invite bidders for setting up greenfield manufacturing facilities under the production-linked incentive (PLI) scheme to promote ACC manufacturing in the country, as previously announced in the National Programme on Advanced Chemistry Cell (ACC) Battery Storage.<\/p>\n<p>Selected bidders that agree to building an ACC battery storage manufacturing facility with a minimum capacity of 5 GWh will get tax benefits in the form of cash subsidies under the programme.<\/p>\n<p>The PLI programme calls for a total manufacturing capacity of 50 GWh for ACCs, as well as an extra 5 GWh for specialised ACC technologies with a minimum threshold capacity of 500 MWh.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report The Ministry of Heavy Industries (MHI) has issued a Request for Proposal (RFP) to invite bidders for setting up greenfield manufacturing facilities under the production-linked incentive (PLI) scheme to promote&#8230; <\/p>\n","protected":false},"author":1,"featured_media":2127,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/battery.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/2126"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=2126"}],"version-history":[{"count":2,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/2126\/revisions"}],"predecessor-version":[{"id":2129,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/2126\/revisions\/2129"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/2127"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=2126"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=2126"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=2126"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}