{"id":18023,"date":"2023-07-06T04:42:43","date_gmt":"2023-07-06T04:42:43","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=18023"},"modified":"2024-11-27T11:09:06","modified_gmt":"2024-11-27T11:09:06","slug":"oil-gas-psus-set-a-target-of-0-7-mtpa-green-hydrogen-capacity-by-2030","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/oil-gas-psus-set-a-target-of-0-7-mtpa-green-hydrogen-capacity-by-2030\/","title":{"rendered":"Oil &#038; gas PSUs set a target of 0.7 MTPA green hydrogen capacity by 2030"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/18023?pdf=18023\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p>&nbsp;<\/p>\n<p>Rameswar Teli, the minister of state for petroleum and natural gas, stated that oil and gas sector PSUs have a goal of putting up 0.7 million tonnes per annum (MTPA) green hydrogen manufacturing capacity.<\/p>\n<p>Furthermore, according to Teli, the PSUs are planning to set up 120 kilo tonnes of green hydrogen capacity by 2025\u20132026. Teli was speaking at the three-day International Conference on Green Hydrogen (ICGH 2023).<\/p>\n<p>The Minister also informed the participating delegates about various projects being undertaken by the oil and gas sector PSUs dealing with various stages of the green hydrogen value chain.<\/p>\n<p>This includes state-run Oil India, which has initiated a pilot plan for mixing green hydrogen in gas pipelines in Jorhat (Assam). For this, the company is manufacturing 10 kg of green hydrogen per day.<\/p>\n<p>Besides, the gas utility GAIL has started a project of mixing 2 per cent green hydrogen in piped natural gas (PNG) in Indore (Madhya Pradesh), Teli said.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report &nbsp; Rameswar Teli, the minister of state for petroleum and natural gas, stated that oil and gas sector PSUs have a goal of putting up 0.7 million tonnes per annum&#8230; <\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163,1893],"tags":[],"jetpack_featured_media_url":"","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/18023"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=18023"}],"version-history":[{"count":2,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/18023\/revisions"}],"predecessor-version":[{"id":18122,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/18023\/revisions\/18122"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=18023"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=18023"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=18023"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}