{"id":17940,"date":"2023-07-03T05:44:37","date_gmt":"2023-07-03T05:44:37","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=17940"},"modified":"2023-07-04T05:47:36","modified_gmt":"2023-07-04T05:47:36","slug":"operation-begins-at-renewable-energy-project-in-vijayanagara-karnataka","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/operation-begins-at-renewable-energy-project-in-vijayanagara-karnataka\/","title":{"rendered":"Operation begins at renewable energy project in Vijayanagara, Karnataka"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/17940?pdf=17940\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/01\/Renewable-Energy-Sector.jpg\" \/><\/p>\n<p>In the Vijayanagara district of Karnataka, Kudligi&#8217;s renewable energy (RE) project by Renew Sandur Green Energy (RSGEPL) has been put into operation. The RE project, which includes a 9.9 MW wind farm and a 33 MW solar farm, will lessen reliance on fossil fuels and improve the environment.<\/p>\n<p>A joint equity-based agreement was struck by Renew Energy Global PLC, the parent company of Renew Green Energy Solutions (ReNew), and Sandur Manganese &amp; Iron Ores (SMIORE) to build a power plant that uses solar and wind energy to produce sustainable electricity.<\/p>\n<p>ReNew company and SMIORE are committed to a sustainable future, and this project is expected to contribute significantly to the region\u2019s RE capacity.<\/p>\n<p>Gurugram-based ReNew has a renewable asset base of 13.7 GW, including projects under development and in the pipeline.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report In the Vijayanagara district of Karnataka, Kudligi&#8217;s renewable energy (RE) project by Renew Sandur Green Energy (RSGEPL) has been put into operation. The RE project, which includes a 9.9 MW&#8230; <\/p>\n","protected":false},"author":1,"featured_media":4091,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163,141],"tags":[2485,610],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/01\/Renewable-Energy-Sector.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/17940"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=17940"}],"version-history":[{"count":2,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/17940\/revisions"}],"predecessor-version":[{"id":17944,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/17940\/revisions\/17944"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/4091"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=17940"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=17940"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=17940"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}