{"id":17543,"date":"2023-06-29T04:47:02","date_gmt":"2023-06-29T04:47:02","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=17543"},"modified":"2023-06-30T04:57:57","modified_gmt":"2023-06-30T04:57:57","slug":"rs-865-crore-investment-to-be-madeby-ev-manufacturer","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/rs-865-crore-investment-to-be-madeby-ev-manufacturer\/","title":{"rendered":"Rs 865 crore investment to be madeby EV manufacturer"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/17543?pdf=17543\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/06\/Ather-Energy-to-set-up-manufacturing-hub-in-TN.jpg\" \/><\/p>\n<p>Ather Energy has confirmed a staggering Rs 865 crore investment in the Shendra Phase of the Aurangabad Industrial City (AURIC).<\/p>\n<p>The investment in AURIC is expected to establish a robust supplier ecosystem in the state.<\/p>\n<p>The approval for the investment was granted by Chief Minister Eknath Shinde during a meeting of the cabinet sub-committee of the industries department on Wednesday.<\/p>\n<p>Nitin Gupta, the president of the Chamber of Marathwada Industries and Agriculture, highlighted the efforts made by the CMIA to attract investments to Auric.<\/p>\n<p>The Ather Energy project will introduce the EV market to the industrial sector in the city and pave the way for the establishment of several vendor companies in the district.<\/p>\n<p>The CMIA had engaged in discussions with Ather Energy&#8217;s founder, Tarun Mehta, co-founder Swapnil Jain, manufacturing head Sanjeev Kumar Singh, and director Murali Sasidharan regarding the proposed investment.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Ather Energy has confirmed a staggering Rs 865 crore investment in the Shendra Phase of the Aurangabad Industrial City (AURIC). The investment in AURIC is expected to establish a robust&#8230; <\/p>\n","protected":false},"author":1,"featured_media":9020,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[82],"tags":[225],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/06\/Ather-Energy-to-set-up-manufacturing-hub-in-TN.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/17543"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=17543"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/17543\/revisions"}],"predecessor-version":[{"id":17550,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/17543\/revisions\/17550"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/9020"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=17543"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=17543"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=17543"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}